Laserfiche WebLink
0 RECEIVEL <br /> F.In-Tank Gauging/SIR Equipment: MAR 2015 <br /> F Check this box if tank gauging is used only for invent <br /> r' Check this box if no tank gauging or SIR equipment is' rONMENTAL <br /> P <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the <br /> � foallhekl'st: <br /> Yes No* Has ainput wiring been inspected for properentry <br /> and termination,including testing for ground faults? r <br /> . > Tom,,. ��,> y �� �,y;, , ,,,: ,,, ,,,.; •, or, : <br /> f— Yes F No* Were all tank gauging probes visually inspected for damage and residue buildup? ! <br /> , wr,::a r,.r.:m- i3�cE; .w z7d3 w; w sw�;<: o,.::a;:�:•�. r»^ s T :•. �s�4i"aazS'x1ss :�ixxa�gm:<hz.cu,:,.:,-..• �, r .ae -. .�����o.s.:,r e.,.,N.:: �. �• :-. v,u���a.:�,:,� <br /> F Yes F No* Was accuracy of system product level readings tested? <br /> F Yes F No* Was accuracy of system water level readings tested? <br /> �s F Yes F No* Were all probes reinstalled properly? <br /> F Yes F No* Were all items on the equipment manufacturers maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): F Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> Yes r No For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance?(Check <br /> N/A all that apply) Simulated leak rate r 3 gp h r 0.1 g.p.h; 10.2 g p h. <br /> Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? �? <br /> i F Yes F No* Was the testing apparatus properly calibrated? £1 <br /> mechanical LLDsdoes the L <br /> E � Yes �" No* For mech , LD restrict� product flow if it detects a leak? � <br /> F N/A <br /> +�3 <br /> i _..:.._. W. . .w _... <br /> r Yes No* For electronic LLDs,does the turbine automatically shut off i f the LLD detects a leak? <br /> (1 <br /> } N/A <br /> r Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled or f' <br /> N/A disconnected? <br /> j Yes r No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> E <br /> F Yes r No* For electronic LLDs,have all accessible ng connections been visually inspected? <br /> F N/A <br /> 3 Yes r No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe haw and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Suction System <br />