My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:56:31 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 2 0 2016 <br /> SWRCB,January 2002 <br /> M sky. , <br /> 5. SECONDARY PIPE TESTING - �'�m L',,�� -' —Test Method Developed By: ❑Piping Manufacturer El Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑x Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: 4" Dial Gauge Equipment Resolution: .1 <br /> Supp/Ret UE0460002 <br /> Piping Material: Poly <br /> Piping Manufacturer: Enviro Flex <br /> Piping Diameter: 3" <br /> Length of Piping Run: Approx. 100' <br /> Product Stored: Diesel <br /> Method and location of Test Boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 min. <br /> starting test: <br /> Test Start Time: 9:30 am <br /> Initial Reading(Ri): 5 psi <br /> Test End Time: 10:30 am <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 hour <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or 0 <br /> Criteria: <br /> Test Result: ❑X Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail ❑Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.