Laserfiche WebLink
0 0 Ra;esvEl) <br /> F. In-Tank Gauging/SIR Equipment: <br /> ® Check this box if tank gauging is used only for inventorffiBU21.5 2016 <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. ENTAL <br /> ENVIRONI <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. t4r$FTu r1r-P�A rt,,,T <br /> Complete the following checklist <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> .^ ....... "� \\\\\\i'.. \k \ \\��..\\y"M. _-- \\\\Y"\@\C `�`i's .,:'� a\ .o '�F.. •c: i?A \\ Y°•.f{ .... .r�� y'!2. .` �,:xv\s..c,�..A\ < +,.. a.;�C:::A�fte <br /> ❑Yes ❑No" Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Ph <br /> 'as❑No* as accuracy of system product level readings tested? <br /> ✓€.MS:RCe NEW"" <br /> ❑ No* <br /> "Was accuracy of system water level readings tested? <br /> Yes E] <br /> r'\\\U�\\\U WMXk4k^\ 4 sem': '.X., v .,nti1 e' &:'.o\\\\\\ ...y 1'„4Yrl�".s�`.U�` vaa a\, <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> .=tcaVAAA�a �, Z:.�vvvvv .::�: a �+ �',?aaVA.�...:,A\ ..��.,.a.r,a�ow �taar :�..aA „; e c..�.,,.:.::a ,:�A .::::.�vr.. .�t�AAAv..�,svr�o,:::: ., .,:ti .,,a,.._i,��. •a\a;:F .a�.:,::w : <br /> Were all items on the equipment manufacturers maintenance checklist completed? <br /> El Yes ❑No* i <br /> _ -Al*In i <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G.Line Leak Detectors(LLD): Q Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ❑Yes ❑No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD perform an ce?(Ch eck <br /> ❑N/A all that apply) Simulated 1 eak rate F-13 g.p.h.; ❑0.1 g.p.h;❑0.2 g.p.h. <br /> 11 ❑Yes ❑No* Were all I IDs confirmed operational and accurate within regulatory requirements? <br /> 11 <br /> El Yes ❑No* Was the testing apparatus properly calibrated? ' <br /> ,,.,. _ _ _ <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow r m._ m <br /> f rt detects a leak? <br /> ❑N/A <br /> ❑Yes El No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? � <br /> ” ❑N/A <br /> a, ... . _.. ..._. _ <br /> Yes <br /> El _ y., .. <br /> ❑ * For electronic LLDs, does the turbine automaticallyshut off i fan portion of the monitoring system is disabled or <br /> El N/A <br /> drsconnected� <br /> _ <br /> ❑Yes El NO For electronic LLDs,does the turbine automatically shut off ifany�portion ofthe�monitoring system malfunctions or ,ii <br /> ❑N/A <br /> tai is a test? ? <br /> ❑Yes ❑No For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> ❑N/A <br /> ❑Yc ❑No* Were all items on the equipment manufacturers maintenance checklist completed <br /> *In the Section K below,describehow and when these deficiencies were or wiR be corrected. <br /> H. Comments: <br /> Suction System <br />