Laserfiche WebLink
UST Monitoring Site Plan REGENEU <br /> Site Address : 1812 Coley Ave. Escalon 95320 2016 <br /> aw Monitoring I i ,.,r-Q,TY n=pfA����� <br /> Drawing NOT to Scale <br /> Business Name: Pacific Bell Telephone Co. dba AT&T Cal. (uG010) <br /> Business Address: 1812 Coley Ave. Escalon <br /> Vent Sump <br /> w1 Sensor(L3) AT&T building <br /> 794380-208— <br /> Annular Sensor <br /> (LI)794390-420 TLS 350 Plus <br /> ai (1st Floor) <br /> -� Engine piping Tray <br /> 1 Sensor(L5) <br /> i ell m " <br /> 794390-420 <br /> Alarm <br /> �---- ------------- <br /> � I I <br /> Fuel Transition Sump <br /> Lines wl Sensor(L4) <br /> 794380-205 <br /> Fill l Piping Sump <br /> w/Sensor(L2) <br /> 794380-208 <br /> Spill Bucket <br /> ATG <br /> S' <br /> Date map was drawn: 2/18/2016 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System <br /> Certification. On your site plan,show the general layout of tanks and piping.Clearly identify locations of the following equipment,if <br /> installed:monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans,spill containers,or other <br /> secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level probes(if used for leak detection).In the <br /> space provided,note the date this Site Plan was prepared. <br />