My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LINCOLN
>
907
>
2300 - Underground Storage Tank Program
>
PR0231871
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 3:56:31 PM
Creation date
6/23/2020 6:53:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0231871
PE
2361
FACILITY_ID
FA0003968
FACILITY_NAME
AT&T California - UE046
STREET_NUMBER
907
Direction
W
STREET_NAME
LINCOLN
STREET_TYPE
Rd
City
Stockton
Zip
95207
APN
077-470-07
CURRENT_STATUS
01
SITE_LOCATION
907 W Lincoln Rd
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231871_907 W LINCOLN_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
311
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Monitoring Site Plan REGENEU <br /> Site Address : 1812 Coley Ave. Escalon 95320 2016 <br /> aw Monitoring I i ,.,r-Q,TY n=pfA����� <br /> Drawing NOT to Scale <br /> Business Name: Pacific Bell Telephone Co. dba AT&T Cal. (uG010) <br /> Business Address: 1812 Coley Ave. Escalon <br /> Vent Sump <br /> w1 Sensor(L3) AT&T building <br /> 794380-208— <br /> Annular Sensor <br /> (LI)794390-420 TLS 350 Plus <br /> ai (1st Floor) <br /> -� Engine piping Tray <br /> 1 Sensor(L5) <br /> i ell m " <br /> 794390-420 <br /> Alarm <br /> �---- ------------- <br /> � I I <br /> Fuel Transition Sump <br /> Lines wl Sensor(L4) <br /> 794380-205 <br /> Fill l Piping Sump <br /> w/Sensor(L2) <br /> 794380-208 <br /> Spill Bucket <br /> ATG <br /> S' <br /> Date map was drawn: 2/18/2016 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System <br /> Certification. On your site plan,show the general layout of tanks and piping.Clearly identify locations of the following equipment,if <br /> installed:monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans,spill containers,or other <br /> secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level probes(if used for leak detection).In the <br /> space provided,note the date this Site Plan was prepared. <br />
The URL can be used to link to this page
Your browser does not support the video tag.