My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_1986-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 1:44:19 PM
Creation date
6/23/2020 6:53:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2000
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_1986-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING ALTERNATIVE 7 <br />Implementation of this monitoring alternative will require <br />Weekly Tank Gauging and Annual Tank Integrity testing. If <br />this monitoring alternative is chosen implementation should <br />be carried out as follows: <br />Perform the initial tank integrity test/tests to confirm <br />that the tank/tanks do/does not leak at the time of <br />implementation of the monitoring alternative. Integrity <br />testing must be done within one year prior to <br />implementation of the monitoring alternative. Based on <br />information obtained from facility personnel all/the <br />tanks/tank at this facility have passed an integrity test <br />within the last year. <br />2) Weekly tank gauging will require that the tank be secured <br />for a period no less than 36 hours. During this time no <br />inputs or withdrawals will be allowed from the tank. The <br />fuel level at the beginning and end of this period will be <br />measured manually using a calibrated stick (or using <br />automatic liquid level sensing.equipment) with an accuracy <br />of +9 gallons. Weekly gauging shall be as specified in <br />Section 2641, Alternative 7 in the Underground Storage Tank <br />Regulations. <br />3) Tank integrity testing to determine that total product loss <br />from the tank does not exceed 0.05 gallons per hour, shall <br />be performed yearly. Integrity testing shall be carried <br />out as described in Section 2543 of the Underground Storage <br />Tank Regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.