My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_1986-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 1:44:19 PM
Creation date
6/23/2020 6:53:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2000
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_1986-2000.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
308
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />Site Safety Plan <br />Page two: <br />Note: Tank hole will be filled completely as soon as soil samples are analyzed and depending on analytical <br />report of contamination what and when will backfill. <br />Stockton Service Station Eq. Co., Inc., will use proper equipment for each tank removal. No undersize or defective <br />mechanical equipment will be used. All heavy equipment will be supported properly, tanks are to be secured at <br />the assigned location after extraction. <br />Stockton Service Station Eq. Co., Inc., will provide safety hats, goggles and clothing to employees at the job site <br />as per O.S.H.A. Regulation 29 CFR 1910,120. Caution will be noted that a heat stress situation may develope <br />when impermeable protective clothing is worn. Stockton Service Station Eq. Co., Inc., will hold shop meetings before start of tank <br />removals to discuss safety procedures. The 'Buddy System" will be discussed and the course <br />of action to be taken should an injury occur to an employee. Some of the many rules to be discussed to help <br />prevent injury or accident are: <br />1. Avoid standing on top of the tank surface, it may be slippery or rusty. <br />2. Check for falling objects, slipping and tripping hazards. <br />3. Visqueen sheeting will be used if necessary around excavated soil. <br />4. If necessary, the site will be secured and warning signs posted to prevent the exposure of unauthorized <br />unprotected people to site hazards. <br />5. Limit exposure to noisy equipment. <br />6. Keep a safe distance from the excavation and heavy equipment. <br />7. Stay upwind from the tank and/or excavation to avoid unnessory exposure whenever possible. <br />8. Avoid the area or take special caution when ventilating the tanks with water, dry ice or air. <br />9. Stockton Service Station Equipment Company, Inc., shall provide a hospital route map on job site. <br />Written by, <br />Mike Flores <br />Stockton Service Station Equipment Company, Inc. <br />MF:law <br />
The URL can be used to link to this page
Your browser does not support the video tag.