Laserfiche WebLink
The tank pit will be backfilled with clean import pea gravel and will be compactei? <br />to minimize settling. The top twelve inches will be backfilled with 1/4CIass II AB <br />and compacted to 90%. Concrete will be placed for tank top and drive pad an4- <br />1 V2 inch asphalt overlay for the rest of the facility. <br />3.1.1 Site Cleanup <br />On completion of all site activities, the area will be restored to its original <br />condition. All equipment will be decontaminated before removal from the site as <br />necessary. Removal of the tank, contaminated soil, or other waste materials <br />generated ve <br />regulations. <br />