Laserfiche WebLink
Correction or comments made on the shop drawings during <br />this review do not relieve contractor from cnrnpliance &ti th <br />requirements of the drawings a,,d specifications. i hiT <br />check is only for rf `.;fit<. c+ :Js vera ,:7ntormance �vit': ?hg <br />design concept of the <br />the information gi4en <br />tor is respon3;a'e for cr.lfii' r.,tg .-?t:j c--,wt.yjating ail qunrut. <br />ties and dimensions; 5a;k CtrIc. Tac;icaiio,^ %roc»sses �:nv <br />techniques of construction; cWrvinatinq work with tna: qt <br />all other trades; and performing the work in a safe ant <br />satisfactory manner. Tne above action is contingent up% <br />no increase in contract price nor extension of contract time. <br />Date 94 <br />L- gy 1-�fj , <br />Number 107517 <br />Jim Ueda, <br />Project Manager <br />11/13/02 <br />W.O. <br />UST Stockton Highway Patrol <br />Table of Contents <br />Submittals for section 13215 <br />Sub Sec. <br />Description <br />Manufacturer <br />Part No. <br />Pages <br />2.03 <br />Fluid Monitoring System <br />Control Panel <br />Veeder Root <br />TLS 350 <br />2 <br />Magnestrictive Probe <br />Veeder Root <br />847390-107 <br />2 <br />2.04 <br />Leak Detection System <br />Piping Sump Sensor <br />Veeder Root <br />794390-205 <br />2 <br />Interstitial Steel Tank Sensor <br />Veeder Root <br />794390-420 <br />1 <br />2.05 <br />18" Manway Cover <br />Pomeco <br />6110-WT <br />1 <br />2.06 <br />Spill Containment Traffic Cover <br />Integrated Spill Box and Traffic Cover <br />OPW <br />6571 EVRB160037RT052 <br />12 <br />2.07 <br />Tank Fill Connections <br />Vapor Recovery Swivel Top <br />OPW <br />61VSA-EVR <br />inc. <br />Fill Swivel Top <br />OPW <br />61SA-EVR <br />inc. <br />2.08 <br />Fill Cap <br />OPW <br />OPW634TT-EVR <br />inc. <br />Vapor Recovery Cap <br />OPW <br />1711T-EVR <br />inc. <br />2.09 <br />Aluminum Fill Pipe <br />OPW <br />61 T <br />inc. <br />2.10 <br />Overfill Prevention Valve <br />OPW <br />61 SO <br />inc. <br />2.11 <br />Float Vent Valve <br />OPW <br />53VML-0120 <br />inc. <br />2.12 <br />Extractor Housing <br />OPW <br />233VM-4422 <br />inc. <br />2.13 <br />Float Vent Extractor Wrench <br />OPW <br />89-0044 <br />1 <br />2.14 <br />Pipe Riser Cap <br />OPW <br />116-7085 <br />1 <br />2.18 <br />Tank Piping and Fill Sumps <br />Western Fiberglass <br />42" X 36" <br />2 <br />2.19 <br />37" Manway Cover <br />OPW <br />6110-37wt <br />1 <br />2.20 <br />Pressure Vacuum Vent Cap <br />Husky <br />4885 <br />1 <br />2.21 <br />Double Wall Piping System <br />Primary Product Line <br />Total Containment <br />PP1503 <br />1 <br />Secondary Containment Piping <br />Total Containment <br />SP4500 <br />inc. <br />Primary Coupling <br />Total Containment <br />FC1503 <br />inc. <br />Primary Coupling Washer <br />Total Containment <br />WS1000 <br />inc. <br />Primary Adapter <br />Total Containment <br />SA2020 <br />1 <br />Primary Elbow <br />Total Containment <br />EL1500 <br />inc. <br />2.23 <br />Submersible Fuel Pump <br />3/4 HP Variable Length Turbine <br />F.E. Petro <br />VI-2 <br />1 <br />STP Mechanical Leak Detector <br />F.E. Petro <br />STP-MLD <br />1 <br />Submersible Fuel Pump Controller <br />F.E. Petro <br />STP-DHL <br />1 <br />2.24 <br />Steel Braided Flex Connector <br />Titeflex <br />2" X 30" <br />4 <br />2.27 <br />Rigid Piping System <br />A.O. Smith <br />Red Thread II <br />1 <br />2.28 <br />Secondary Containment Boot for the Vent <br />Total Containment <br />3" <br />1 <br />2.32 <br />Steel Island Form 4'X 10'X 13" <br />Baker Industries <br />515 <br />1 <br />2.33 <br />Recessed Air and Water Reel <br />Duro <br />1003 <br />1 <br />2.34 <br />Air Gauge <br />Amflo <br />128 <br />inc. <br />2.37 <br />Fuel Dispenser w '��i toc'= / <br />Gasboy PROFESSION& SERVICE Tw1 <br />2 <br />Pu1S e-r1 <br />DESIGN SERVICES SECTION <br />No Exception <br />Taken 'on See Comments <br />Revise and Resubmit ® Rejected <br />Correction or comments made on the shop drawings during <br />this review do not relieve contractor from cnrnpliance &ti th <br />requirements of the drawings a,,d specifications. i hiT <br />check is only for rf `.;fit<. c+ :Js vera ,:7ntormance �vit': ?hg <br />design concept of the <br />the information gi4en <br />tor is respon3;a'e for cr.lfii' r.,tg .-?t:j c--,wt.yjating ail qunrut. <br />ties and dimensions; 5a;k CtrIc. Tac;icaiio,^ %roc»sses �:nv <br />techniques of construction; cWrvinatinq work with tna: qt <br />all other trades; and performing the work in a safe ant <br />satisfactory manner. Tne above action is contingent up% <br />no increase in contract price nor extension of contract time. <br />Date 94 <br />L- gy 1-�fj , <br />