My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2004
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AD ART
>
3330
>
2300 - Underground Storage Tank Program
>
PR0231901
>
COMPLIANCE INFO_2001-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2020 10:41:23 AM
Creation date
6/23/2020 6:53:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2004
RECORD_ID
PR0231901
PE
2361
FACILITY_ID
FA0003825
FACILITY_NAME
CALIFORNIA HIGHWAY PATROL #265*
STREET_NUMBER
3330
Direction
N
STREET_NAME
AD ART
STREET_TYPE
RD
City
STOCKTON
Zip
95215
CURRENT_STATUS
02
SITE_LOCATION
3330 N AD ART RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231901_3330 N AD ART_2001-2004.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
265
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />12/02/2002 15:49 FAX 9163715270 TITAN-PHE WSAC <br />tj411lKA=_V Id =4 =1 %171 go's 0 =7 <br />INSTALLATION SITE TESTING PROC <br />O ' n #'i : FXJMRIOR HOLIDAY TEST option #2,. VACUILI A <br />Prior to arrival of the Elutron® tank at the installation The Elutrotl® tank may be dcR <br />site, coordinate with the ElutronO manufacturer to have the factory_ The delivery doeumei <br />a 12,500 volt holiday test perforated using a T"utker-Rasor, for acceptance at the delivery loc <br />Model APW, tester_ Any pinholes detected must be delivery document when the tank <br />repaired using the Plasteel(p sealing kit materials. Rc-test from the vacuum gauge reading <br />anus' repair until tank is pinhole free. This test must be call the factory for further instruct <br />s7fcrrned by a person qualified by the Elutron(9 tank at the installation, follow the inst <br />manufacturer: �{ y j NOT <br />apply a vacuum tto®.the <br />±ppi <br />Ocition Raise PRESSURE TEST INTO <br />Z007 <br />N' Double -Wall <br />Tank <br />ed with an interstitial vacuum established at <br />will state the vacuum gauge reading required <br />on. Record the vacuum gauge reading on the <br />delivered. If the vacuum gauge has decreased <br />ted for acceptance on the delivery document <br />is. If an interstitial vacuum is to be established <br />Tions in Appendix B. Interstitial Vaetwm Test. <br />ary tank, DAMAGE MAX OCCDR. <br />If a field pressure test is required set-up test equipment per the schematic diagram and precisely follow the test procedures listed. <br />Step 1. <br />Ensure gauges are accurately calibrated. <br />2. <br />Ensure all Connections are leak tight. <br />3. <br />Close V2, open V3, G2 should read zero. <br />4. <br />Open V1, pressurize primary tank until G1 reads <br />3-5 psig, close V1. Disconnect air source. <br />5. <br />Close V3, after 30 minutes, check G2. G2 should read <br />zero. (Call factory if G2 does not read zero.) <br />S_ <br />Open V1 and decrease 131 to 1112 - 2 psig. Close V1. <br />7, <br />Open V2, pressurize G2 to 1112 - 2 psig. Close <br />V2 DQ NQT EXCEED 2 PSIG ON G2. D13MMF <br />TO TANKMAY OCCU& <br />a. Observe ( <br />1112-2p <br />9. Open V3, <br />10. Open V1, <br />Test coml <br />NOTE*. If the Elt <br />test the interstice at 3 <br />increasing the pressure <br />remain at -3-5 PSIG. <br />Pressure Rjtt,F4ui_, ,_ nTnt SMcificattons PRESSURE BLEED -OFF <br />Gauges: 5 psig maximum scale <br />Valves: Globe type, 30 psi min. VALVE <br />^ressure Relief Device: 5 psig max. (v2) <br />INTERSTICE PRESSURE GAUGE (G2) <br />nrnNG \ <br />FRP LAMINATE <br />SECONDARY WALL <br />INTERSTICE <br />STEEL PRIMARY <br />INNER TANK <br />MONITOR TUBE -�-d <br />HST-3-99E•A <br />for 30 minutes. G2 should remain at <br />. (Cali factory 0 G2 decreases to zero.) <br />rit interstice. G2 to read zero. <br />nt primary tank, G1 to read zero. <br />A tank is covered with backfill, you may <br />PSIG. following steps #1-10. and carefully <br />step #7 to 3-5 PSIG. In step #8, G2 should <br />VALVEd (V3) <br />VAL (V1) <br />TANK <br />li <br />903011101 AIR SOURCE <br />(Gt) <br />PRIMARY TANK PRESSURE GAUGE <br />i <br />5 PSIG <br />PRESSURE <br />RELIEF <br />DEVICE <br />
The URL can be used to link to this page
Your browser does not support the video tag.