Laserfiche WebLink
.^a 'r <br />8. DEALING WITH THE PUBLIC " <br />�t <br />At all times are the public to be kept off of the site. All projects that <br />require it will be fenced off with a 6' high chain link fence or a 6' <br />orange alpine fence. No unauthorized personnel may be on-site <br />during any phase of operations. Personnel that are visiting or <br />inspecting as site are required to first make themselves familiar with <br />the site conditions and make it their responsibility to wear the proper <br />clothing and protection to make their site visit a safe one. <br />Hydro -carbon bearing soil may encountered near existing dispenser <br />islands, which are planned for re -use, if this is the case, the following <br />procedures will be followed in order to meet County requirements for <br />permits to install new tanks and piping: <br />B & T will leave product line excavations in the current locations <br />in relation to the pump islands. During the installation of the new <br />product lines, enough soil will be excavated to allow a 2'- wide <br />and deep clean area around the new piping. <br />Excavations under the islands will allow a 2' -deep excavation <br />and as much area on the sides as possible without <br />compromising the structural integrity of the canopy supports. <br />2. Any contaminated soil removed during the construction will be <br />Stored on-site. The materials will be stockpiled on 6 -mil <br />visqueen plastic, and covered with the plastic with either soil <br />containerization to follow (either drums or roll -offs) immediately <br />upon completion of soil removal. This method will be used <br />unless on-site treatment has been pre -approved. <br />3. B & T will follow all California Code of Regulations Title 23 <br />Water Resources Control Board, Division 3, Chapter 16 <br />Underground Tank Regulations, and the Uniform Fire Codes <br />79.101-79.1007 for all underground and aboveground fuel <br />storage tank removals, installations and modifications. All other <br />County regulations will be followed as required. <br />Keep all work and debris out of the public right of way. If work <br />occurs in the right-of-way make sure it is properly secured and <br />safe at the end of every working day. <br />Broom sweep the public right-of-way at the end of every working <br />day. <br />