My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14971
>
2300 - Underground Storage Tank Program
>
PR0231911
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
6/23/2020 6:53:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231911
PE
2361
FACILITY_ID
FA0000540
FACILITY_NAME
COUNTRYSIDE LIQUORS & GAS
STREET_NUMBER
14971
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06316025
CURRENT_STATUS
01
SITE_LOCATION
14971 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231911_14971 N HWY 88_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 01 <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sigov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT CONTINUED <br />Facility Countryside Liquor & Gas Facility 14971 N. Hwy 88 Lodi, CA 95240 Da Inssection Apr 17, 2013 <br />Name: ry q Address: <br />VIOLATIONS <br /># <br />C1 <br />C2 <br />M <br />Code SeCtlon <br />HSC = CA Health and Safe Code; CFR = Code of Federal Regulations <br />C1 = Class 1 violation; C2 = Class 2 violation; M = Minor violation <br />Non -Pressurized Piping (continued) <br />702 <br />CCR 2643(e) <br />Biennial tightness test of gravity piping not performed (pre -January 1, 1984) (M7) <br />703 <br />CCR 2643(d) <br />Triennial line test for conventional suction piping not performed (pre -January 1, 1984) (M7) <br />Other Violations <br />999 Other: See attached "Continuation — Official Inspection Report" for violation(s) not listed above. <br />SUMMARY OF VIOLATIONS <br />CLASS 1, CLASS 11, or MINOR -Notice to Comply) <br />On site to conduct a routine inspection and witness the annual monitoring system certification testing. <br />104. Financial responsibility documents have not been submitted to the EHD. Current financial <br />responsibility documents are required to be submitted annually. Complete and submit a copy of the <br />financial responsibility by May 17, 2013. <br />105. UST facility and tank forms have not been submitted to the EHD. Any change of information on <br />these forms must be submitted to the EHD within 30 days of the changes. Immediately complete and <br />submit a copy of the facility and tank forms to the EHD. Complete a separate tank form for each tank. <br />106 & 202. Current approved copies of the monitoring and response plans were not on site. The <br />monitoring and response plans must be current and approved by the EHD. Complete and submit a copy <br />of the monitoring and response plans for approval by the EHD by May 17, 2013. An approved copy will <br />be returned for your records. <br />107. A written procedure for monitoring, submitted on the "Underground Storage Tank Monitoring Plan" <br />in Title 27, Division 3, Subdivision 1, Chapter 6, which establishes: The location(s), as identified on a plot <br />plan, where the monitoring be has not been submitted to the EHD. Complete and submit a copy of the <br />plot plan/site map that shows where the monitoring equipment is located. Submit the plot plan/site map <br />with the monitoring and response plans for approval by the EHD by May 17, 2013. An approved copy <br />will be returned for your records. <br />108. Secondary containment testing was last performed on February 23, 2010, and was completed on <br />March 25, 2013, one month past due. Secondary containment testing is required once every 36 months. <br />Take all necessary precautions to ensure testing is performed in a timely manner. <br />201. The diesel turbine sump sensor alarmed on December 2, 2012 and the designated operator did not <br />document this alarm on the monthly designated operator report nor was the facility alarm log on site. <br />Ayyaz Khan explained that the business owner is called for any automatic alarm print out and that <br />nothing else is done with the alarm print out such as documenting the alarm on a facility alarm log. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE. <br />THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Inspector: Received By: Title: <br />AK 0�� I <br />EHD 23-02 Rev 04119/12 Page 3 UST INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.