Laserfiche WebLink
9255517888 Line 1 <br />imUETTae-RYAN INC. <br />14:45:43 08-26-2413 4114 <br />GR Job # 20-591947 <br />F. In -Tank Gauging / SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is Installed. <br />This section must be completed if In -tank gauging equipment is used to perform leak detection monitoring. <br />Comolete the foliowina chacklist! <br />I, <br />Yes <br />❑ <br />o <br />Has all input wiring been inspected for proper entry and termination, Including lasting for ground faults? <br />C <br />Yes <br />[3 <br />No" <br />Were a0 tank gauging probes visually inspected for damage and residue buildup? <br />E <br />Yes <br />Ij <br />No" <br />Was accuracy of system products level readings tested? <br />[,t <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />E <br />Yes <br />® <br />No' <br />Were all probes reinstalled properly? <br />E <br />Yes <br />[I <br />No' <br />Were all items on the equipment manufactumes maintenance checklist completed? <br />in me aeouon n, oeNoW, aescrme now ane wnen mese aencrencieS were or win me corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLOs are not installed. <br />Comnlats the fallowlnn Phankilat- <br />rl <br />❑ <br />o <br />or equipment start-up or annual equipment caftification, was a leak simulated to v—eiFy LLD performance? (check all <br />❑ <br />NIA <br />that apply) Simulated teak rate: Ia 3 g.p.h. [] 0.1 g.p.h. ❑ 0.2 g.p.h. <br />ff <br />Yes <br />❑ <br />NW <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />E <br />Yes <br />❑ <br />NV <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />❑ <br />No* <br />For Mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />Ij <br />WA <br />rX <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off it the LLD detects a leak? <br />❑ <br />NIA <br />a <br />Yes <br />❑ <br />Nom <br />For electronic LI.Ds, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />0 <br />WA <br />Disconnected? <br />es <br />❑ <br />No" <br />for eOwic LLDs, does the turbine automatically shut off If any portion of the monitoring system malfunctions or <br />❑ <br />NIA <br />fails a test? <br />13No' <br />For electronic LLDs, have all accessible ring connections been visually inspected? <br />LYes <br />0 <br />NIA <br />❑ <br />No" <br />were all Items on the equiETant manufacturer's maintenance checklist completed? <br />- In me aecmn n, oeiow, aescnoe now ano wnen mese aemCiencies were or win ae correctea. <br />G. Comments: <br />Monitoring System Camtification Page 3 of 4 12€07 <br />3 <br />