Laserfiche WebLink
SITIT Site Health and Safety Plan <br />nnnnn Service Station # 000 <br />S J WEAVER <br />CONTRACTING 7%777 xxxxx, CA ccccc <br />Should an on site spill occur, the immediate response will include closing off the source of the spill, if <br />possible, application of the sorbent material or sand bagging, and sweeping, as appropriate. All spills <br />will be investigated, and a written report will be provided to the regulatory agencies in accordance with <br />applicable regulations (as required). <br />9.5 Emergency Alarms/Notifications and Procedures <br />When any emergency occurs on-site, the on-site Project Foreman shall be notified immediately. The <br />Project Foreman shall notify the client and his representatives. Please refer to Attachment I, Route to <br />Area Hospital for direction to the area hospital and Emergency Telephone Numbers. In the event of <br />a medical emergency, fire or spill, personnel will notify the appropriate emergency organization. <br />9.6 Reporting <br />All spills, regardless of size, shall be reported immediately to the Project Foreman. The spill will be <br />immediately reported to client representatives for appropriate notification to regulatory authorities. <br />When reporting the spill, the first step is to determine the nature of the spill, its size, direction of travel, <br />and if anyone has been injured as a result of the spill. Upon notification of a spill, all project activity <br />will be immediately suspended and all necessary equipment and personnel will be diverted to spill <br />control and containment. <br />9.6.1 Incident Identification and Assessment <br />Immediately upon notification, S.J. Weaver Contracting Inc. personnel will assess the situation to <br />determine if a Third Party Emergency Spill Response Service is required based on knowledge of the <br />incident, weather conditions, and other factors. If it is determined that Third Party Emergency Spill <br />Response Service need to respond, all the necessary notifications will be made and S.J. Weaver <br />Contracting Inc. will supervise control measures. If necessary, back-up from the local authorities will <br />be requested. <br />9.6.2 Confinement and Containment <br />Given the nature of project, all the necessary equipment and personnel necessary to deal with a <br />release of hazardous substances shall be available on site. In addition to the heavy equipment and <br />personal protective equipment which is critical to spill control, S.J. Weaver Contracting Inc. shall <br />maintain a spill kit on site at all times. This kit contain all the equipment typically required for spill <br />response including absorbents, and personal protective equipment. <br />Prior to entering a spill area, all workers must be protected from any adverse effects of the spilled <br />material. No one will enter any spill area alone. The Project Foreman will determine the level of <br />protection. For all spills of drummed material, the initial level of protection will be based on the <br />material that has spilled. <br />To the extent practicable, the area will immediately be cordoned off and, if appropriate, exclusion, <br />contaminant reduction and support zones will be established. <br />S.J. WEAVER CONTRACTING INC. <br />Page 15 <br />0004hasp.doc <br />