Laserfiche WebLink
I <br /> JUN 0 12016 <br /> SWRCB,January 2002 Page_5_of_ 7_ <br /> �"Y s� ,. <br /> 7. UNDER—DISPENSER CONTAINMENT • D �T G-— <br /> Test Method Developed By: ❑UDC Manufacturer M Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: INCON SUMP TESTER Equipment Resolution:+1-0.002" <br /> UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: TOTAL CONT TOTAL CONT TOTAL CONT TOTAL CONT <br /> UDC Material: FIBERGLASS FIBERGLASS FIBERGLASS FIBERGLASS <br /> UDC Depth: 33" 33" 33" 33" <br /> Height from UDC Bottom to Top 11" <br /> of Highest Pi ing Penetration: <br /> Height from UDC Bottom to 7" 7" T' 7" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to DIRTY DIRTY DIRTY DIRTY <br /> testing: <br /> Portion of UDC Tested 2"ABOVE 2"ABOVE 2"ABOVE 2"ABOVE <br /> PENETRATION PENETRATION PENETRATION PENETRATION <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No M NA ❑Yes ❑No M NA Elves ❑No M NA [:]Yes ❑No M NA <br /> product and water)?* <br /> Turbine shutdown response time NIA N/A N/A N/A <br /> Is system programmed for fail- <br /> safe shutdown?" Elves ❑No M NA Elves ❑No M NA Elves ❑No ®NA ❑Yes ElNo ®NA <br /> Was fail-safe verified to be <br /> ❑Yes ❑No [DNA []Yes [--]No ®NA Elves [:]No ®NA Elves ❑No MNA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 MIN 15 MIN 15 MIN 15 MIN <br /> starting test <br /> Test Start Time: 11:22 1:07 11:56 1:38 <br /> Initial Reading(Rj): 6.5887" 6.2700" 4.6970" 4.6926" <br /> Test End Time: 11:37 1:22 12:11 1:53 <br /> Final Reading(RF): 6.5883" 6.2636" 4.6951" 4.6672 <br /> Test Duration: 15 MIN 15 MIN 15 MIN 15 MIN <br /> Change in Reading(RF-RI): -0.0004" -0-0064" -0.00191, -0.0254" <br /> Pass/Fail Threshold or Criteria: +1-0.002" +I-0.002" +/-0.002" +I-0.002" <br /> Test Result: MPass ❑Fait ElPass M Fail M Pass El Fail ElPass M Fail <br /> Was sensor removed for testing? M Yes ❑No [INA M Yes ❑No ❑NA M Yes []No ❑NA M Yes ❑No ❑NA <br /> Was sensor properly replaced and ❑NA M Yes ❑No [INA M Yes No ❑No ❑NA <br /> verified functional aftertestina? [9 Yes ❑No ❑ ❑NA ®Yes <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ABOVE IS THE LAST OF TWO BACK TO BACK 15 MINUTE TESTS <br /> UDC'S#3/4 AND#718 FAILED-NO VISUAL LEAKS <br /> WILL NEED TO REMOVE DISPENSERS IN ORDER TO MAKE ANY REPAIRS <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to a�of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />