Laserfiche WebLink
In addition, as noted in your Inspection Report, the line leak detectors were not able to be tested during <br /> the initial inspection on July 28, 2015 due to expired calibration equipment. However, the line leak <br /> detectors were tested with passing results on August 5, 2015. A fully copy of the Annual Monitoring <br /> Certification results, including the line leak detector tests, is included for your review and records, and <br /> will also be uploaded to CERS. <br /> It is our policy to address deficiencies, issues of concern, and/or agency requests regarding our retail <br /> facilities immediately. With the submittal of this letter, it is our understanding that the items of alleged <br /> non-compliance have been resolved. If this is not correct, please contact me as soon as possible. <br /> Many ards, <br /> RECEIVE-1-1 <br /> Sarah muels AUG 12 201"iRetail Compliance Coordinator <br /> Enclosure <br /> li AY'r2S���n �WA�Ae <br />