Laserfiche WebLink
11 REC4 IVED <br /> CIETTLER-RYAN INC. L1 20-640950.1 <br /> SWRCB.January 2002 ge 3 of 4 <br /> ENVIRONMENTAL � L <br /> 6.FILL SUMP TESTING , . . <br /> Test Method Developed By: Tank Manufacturer Industry Standard Professional Engineer <br /> Other(s eci ) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(s eci <br /> Test E ui ment Used: I ncon E ui ment Resolution: 0.0001 <br /> Sum # 87-1 1 sump# 91 Sum # SumP# <br /> Sump Diameter: 44" 44" <br /> Sump De the 56" 56" <br /> Sump Material: Fiberglass Fiberglass <br /> Height from Tank Top to Top of N/A N/A <br /> Highest Pi in Penetration: <br /> Height from Tank Top to Lowest 27" 2701 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Good Good <br /> Portion of SumE Tested(1) 2"above piping 2"abode piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No NA Yes No NA Yes No NA Yes No NA <br /> roduct and waterj?* <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail-safe Yes No NA Yes No NA: Yes No NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes No NA Yes No NA Yes No NA Yes No NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 min 10 min <br /> test: <br /> Test Start.Time: 9:18 9:18 <br /> Initial Reading(Ri): 2.5746 4.6206 <br /> Test End Time: 9:33 9:33 <br /> Final Reading(Rf) 2.5764 4.6203 <br /> Test duration: 15 min 15 min <br /> Change in Reading(Rf-Ri): O.0018 -0.0003 <br /> Pass/Fail Threshold or Criteria: 0.002 <br /> Test Results: x Pass Fall x Pass Fail Pass Fail Pass Fail <br /> Was sensor removed for testing? Yes No NA YesNo NA Yes No NA Yes No NA <br /> Was sensor properly replaced and Yes No NA­ Yes No -NA.i Yes No NA Yes No NA <br /> verified functional after testing? <br /> Comments-(include information on repairs made prior to testing,and recommend follow-up for failed tests) <br /> (1)If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160) <br />