My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2014-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2014-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:13:24 PM
Creation date
6/23/2020 6:54:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2014-2017
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\1617\PR0231923\UST RETROFIT PLAN 2014.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
444
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a6ETTLER-RYAV INC. R Job# 20-640950.1 <br /> SWRCB,January 2002 Page 3 of 4 <br /> 6.FILL SUMP TESTING <br /> Test Method Developed By: Tank Manufacturer lndustry Standard Professional Engineer <br /> Other(specify) <br /> Test Method Used: Pressure Vacuum Hvdrostatic <br /> Other(specify) <br /> Test E ui ment Used: Incon E ui ment Resolution: 0.0001 <br /> Sum # 87-1 Sum # 91 SUMP# <br /> SUMP# <br /> Sump Diameter: _ 44" 44" <br /> Sump Depth: 56" 56" <br /> SumMaterial: Fiberglass Fiberglass <br /> Height from Tank Top to Top of N/A N/A <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest <br /> 27" 27" <br /> Electrical Penetration: <br /> Condition of sump prior to testing. Good Good <br /> Portion of Sump Tested(1) 2"above piping, 2"above piping <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes No NA Yes No NAYes No NA Yes No NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail-safe Yes No NAi Yes No NAi Yes No NA Yes No NA <br /> shutdown?* <br /> Was fail-safe verified to be Yes No NA` Yes No NA' Yes No NA Yes No NA <br /> o erational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 10 min 10 min <br /> test: <br /> Test Start Time: 9:18 9:18 <br /> Initial Reading(Ri): 2.5746 4.6206 <br /> Test End Time: 9:33 9:33 <br /> Final Reading(Rf) 2.5764 4.6203 <br /> Test duration: 15 min 15 min <br /> Chane in Reading(Rf-Ri): 0.0018 -0.0003 <br /> Pass/Fail Threshold or Criteria: 0.002 <br /> Test Results: x Pass Fail x Pass Fail Pass Fail Pass Fail <br /> Was sensor removed for testing? Yei No NA Yes` No NA Yes No NA Yes No NA <br /> Was sensor properly replaced and <br /> verified functional after testing? Yes No Na Yes No NA Yes No NA Yes No NA <br /> Comments-(include information on repairs made prior to testing,and recommend follow-up for failed tests) <br /> (1)If the entire depth of the sump is not tested;specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested.(See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.