My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
1617
>
2300 - Underground Storage Tank Program
>
PR0231923
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2024 2:13:57 PM
Creation date
6/23/2020 6:54:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231923
PE
2361
FACILITY_ID
FA0003606
FACILITY_NAME
ARCO 05450
STREET_NUMBER
1617
Direction
W
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13511015
CURRENT_STATUS
01
SITE_LOCATION
1617 W FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231923_1617 W FREMONT_2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t Ol 0 <br /> GErnER-RYAAf In. GR Job# 1820- 1728 <br /> SWRCB,January 2006 <br /> F. In-Tank Gauging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment Is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform teak detection monitoring. <br /> Complete the following checklist: <br /> E❑ o Has all input wiring been Inspected for proper entry and termination,including testing for ground faults? <br /> ❑ No' Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ No* Was accuracy of system products level readings tested? <br /> ❑ Ne Was accuracy of system water level readings tested? <br /> ❑ NW Were all probes reinstalled properly? <br /> ❑ No' Were ail items on the equipment manufacturers maintenance checklist completed? <br /> n H,below,describe how and when these c were or will be corrected. <br /> G. Line Leak Detectors(LLD): ❑ Check this box if LLDs are not installed. <br /> Complete the following checklist <br /> Yes ® M31or equipment s p or annual equipment certification,was a leak simulated veray LED performance-? <br /> ❑ WA thatappty)Simulated leak rate: ❑ 3 g.p.h. ❑ 0.1 g.p.h. ®0.2 g.p.h. <br /> ® Yes ❑ No* Were at LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No' Was the testing apparatus property calibrated? <br /> Yes ❑ No' For Mechanical LLDs,does the LLD restrict product flow if It detects a leak? <br /> ® WA <br /> ® Yes ❑ No' For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ® Yes ® No* For electronic LI-Os,does the turbine automatically shut off if any portion of the monitoring system is disattied or <br /> ® WA Disconnected? <br /> ® Yes ❑ No' For electronic LLDs,does turbine automatically shut off if any portion of the monitoring system maffunctions or <br /> ® WA falls a test? <br /> ® Yes ❑ No' Fo electronic L a,have all aocessilrle w mg connections been vnsually inspected? <br /> ❑ WA <br /> Yes ❑ No• were all diems on the equipment manufacturer's maintenance checdist completed? <br /> In the section H,below,describe how and when these c were or 11 be corrected. <br /> G. Comments: <br /> Monitoring System Certification Page 3 of 4 12/07 <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.