My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:44:53 PM
Creation date
6/23/2020 6:54:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />PIPING SUMP CONTAINMENT TESTING <br />........... <br />T. st.metihb*'d��i:B :ac <br />V u %J' ...... . ..... <br />. . ...... Q....Man f ... � * P i6 I ET 0; <br />. . .......... .. ..''PrOr ...... I—. o. j"W SUM' 0 fbf M i � .. se **b <br />............ ....................... ......... .... T4 .-the <br />............... ........ ..... ...... ................... .............. ....... <br />...................... ........ ....................... ................ ............... .......... <br />................ ....... ....... ...... ........ .............. ....... ............................................... <br />.......... ............. <br />. .. ... ... ....... <br />. ............... ...... ........... e . .. ............. . . .... <br />W <br />T...est':.Mth _duso. Is <br />I ..... - :: ... ::: ..... <br />.R I. e: 0 O..Va*** . ......... *:'Rol va tk............. r e. <br />.................... ................................. ....... ...................... _ ........ ....... <br />................... ............................ ............... ................ <br />............. ....... ........................... - ........ <br />::Zve 1:.. -. h . <br />41 <br />so. -I chang.e: nx watot <br />t U* di. i�L 1 1'.3 20 IWAlton E 01h."r <br />............. Change ......... . ...... . <br />................ ....... .................. .... <br />.................. ........... ........................ ..................... ...... <br />............ ...... <br />........... .......... ......... <br />. .............................................. <br />...... .......... .... . ........ Xlank: <br />#2:: A'nk 41 ......... <br />............. ....... . . ...... .................................... <br />Sump Material <br />FRP <br />FRP <br />FRP <br />Sump Diameter (inches) <br />...... <br />...... 42" <br />42"42" <br />.... - <br />....... ..... <br />---- . ..... <br />.........Sump Depth (inches) <br />...... ..... <br />42" ..... <br />....... ..... . ..... <br />Product Stored <br />Gasoline -87 <br />.... Gasoline -89 <br />...... <br />....... <br />....... <br />Gasoline -91 ....... <br />Height from tank top to highest <br />xx 6' :X <br />7 <br />. . . ..... <br />7" ....... <br />...... <br />.. ... piping penetration <br />....... <br />....... <br />..... <br />..... <br />...... ...... <br />Height from tank top to lowest ....... <br />..... <br />.... <br />..... ..... <br />101, <br />....... <br />- 91, <br />....... <br />...... <br />...... <br />X <br />X 101, <br />.. ... ..... <br />electrical penetration ...... <br />....... <br />...... <br />...... ..... - <br />...... <br />Condition of sump prior to testing ...... <br />...... <br />....... <br />...... ...... <br />Wet <br />Dry <br />....... .... <br />....... <br />...... ..... <br />Dry ...... <br />Portion of sump tested <br />...... <br />Entire <br />Entire <br />....... ....... <br />....... <br />Entire ........ <br />Is system programed for fail-safe operation? <br />Yes <br />Yes <br />Yes <br />...... Was fail-safe verified to be operational? <br />No <br />No <br />X.X.:X� <br />No <br />Was sensor removed for testing? <br />Yes <br />Yes <br />Yes <br />Was sensor properly replaced after testing? ....... <br />Yes ....... <br />Yes <br />Yes <br />...... <br />...... <br />...... <br />....... ....... <br />Wait time for water level to stabilize (hr:min) <br />...... ...... <br />0:15 <br />... <br />0:15 <br />....... .... ..... <br />....... ...... ...... <br />0:15 <br />Depth of water level from tank top (inches) <br />...... ....... <br />...... ...... <br />12" ....... <br />12 . <br />...... 12' ....... ...... <br />Test start time <br />10:10AM <br />..... ....... <br />10:11 AM <br />10:12 AM <br />Test end time <br />.... ...... <br />..... ....... <br />10:40 AM <br />10:41 AM <br />....... ..... <br />...... <br />10:42 AM <br />Test duration (hr:min) <br />0:30 .... <br />0:30 <br />0:30 ...... <br />Chan.... <br />ge in water level 0.000 inches) <br />0.030 <br />0.000 <br />0.020 ...... <br />Pass/Fail threshold(0.005 inches Y2 Hr.) <br />0.005 <br />....... <br />0.005 <br />0.005 ...... <br />... <br />...........TEST RESULT <br />...... <br />...... <br />FAIL Leak <br />PASS <br />..... - <br />..... - <br />...... ..... <br />FAIL Leak <br />Comments: <br />© 2002 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.