My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:44:53 PM
Creation date
6/23/2020 6:54:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPENSER CONTAINMENT (UDC) TESTING <br />.......... ....... .. . ...... . .... .. . .......... ... ....... <br />V i V Manufacturer ih-*. W.- r K. s.t a i W i -.0. <br />-ess �er: e. <br />............... <br />............ ..................... <br />. .. ... ....... ........ ..................... <br />................. . ...... <br />0. i�A�: sew- ........... - ... ................... - .................. ...... .......... - ... - ..... .................. ....... ............................. <br />......................... su ....... <br />........................ .. .. .. re . ......... ....... M <br />Tes eth d* —P .... -. .....Valwil ���]H rd ..... fie <br />........... ....................... ....... .............. .0 <br />....................... pressure. ........ ............. ....... .. ........... .......... ....... ........... .... . .. <br />.......... ...... - ... ....................... <br />X <br />�A: T tinge q icapir Ald".111I.Sy inn 2001. MAItowlEnalin.6 o* <br />Ch I d' t <br />Me.as'MlJ*n'n***-** I d Level <br />....qqpm n,;:.:se-.-: <br />10: <br />.......... ........... -- ...... ..... .................. .......... ....... f!q ................. ................ �: ......... ......... -, . . .... <br />.......... .................. -.- .... .. ................................ .......... ....... .. ................... ................ .............. <br />.............................. - ...... ...................... ................... ............ ........ <br />............... ---- ...... ........ - ......................... <br />................... ...... ............................ ...... ---- ....... ................ <br />. .. ....... ......... <br />............ - <br />.................... ............... .......... - .................... <br />.................................. - ......... ....... ........ <br />.......... <br />V # 34 <br />.>:;:: ........ <br />.......... a <br />mscriplon <br />................. <br />UDC Manufacturer <br />Bravo <br />Bravo <br />...... <br />UDC Material <br />...... <br />Steel <br />Steel <br />UDC Depth (inches) <br />....... ...... <br />... ....... <br />....... <br />..... ..... <br />Height from UDC bottom to highest <br />Bottom <br />Bottom <br />piping penetration <br />...... Height from UDC bottom to lowest <br />..... <br />...... Bottom <br />...... ...... <br />Bottom ...... <br />..... ..... ....... .... <br />.... electrical penetration <br />...... <br />...... <br />....... ..... ...... <br />...... <br />....... ....... <br />....... .... <br />...... ...... ...... <br />Condition of UDC prior to testing <br />...... <br />Dry <br />..... ..... .... ... <br />...... <br />Dry .... ..... <br />..... <br />Portion of UDC tested <br />...... <br />Entire <br />....... ... <br />..... Entire <br />Type of shut down present <br />Float <br />Float <br />Was sensor removed for testing? <br />N/A <br />N/A <br />Was sensor properly replaced after testing? <br />N/A <br />...... ........ <br />N/A .... - <br />.... ....... <br />...... <br />X <br />Wad time for water level to stabilize hr:min) <br />...... <br />0:30 <br />..... - ... ....... <br />0:30 .... <br />Depth of water level from UDC bottom (in.) <br />XXX.: 6" <br />6" ..... ..... ..... <br />....... .... <br />Test start time. ...... <br />....... <br />10:13AM <br />...... ...... <br />10:14 AM ... ... <br />Test end time <br />10:43 AM <br />X 10:44 AM ..... - <br />Test duration(hr:min) <br />0:30 <br />..... ..... - <br />0:30 ....... ... <br />....... ...... <br />Change in water level 0.000 inches) <br />0.000 <br />..... ...... <br />....... ...... <br />...... ....... <br />....... 0.000 ....... <br />.... ...... <br />..... ..... <br />Pass/Fail threshold (0.005 inches % Hr.) <br />0.005 <br />0.005 .... . . . ..... <br />...... TEST RESULT <br />...... PASS <br />...... <br />.... ....... <br />.... PASS <br />Comments: <br />© 2002 Walton Engineering, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.