My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOCKEFORD
>
205
>
2300 - Underground Storage Tank Program
>
PR0232257
>
COMPLIANCE INFO_1986-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2023 1:44:53 PM
Creation date
6/23/2020 6:54:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2003
RECORD_ID
PR0232257
PE
2361
FACILITY_ID
FA0000670
FACILITY_NAME
QUIK STOP MARKET #3148*
STREET_NUMBER
205
Direction
W
STREET_NAME
LOCKEFORD
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04116115
CURRENT_STATUS
01
SITE_LOCATION
205 W LOCKEFORD ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232257_205 W LOCKEFORD_1986-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"AGILITY NAME: ADDRESS: <br />:AGILITY ID# TANK# UL# TANK L/MATERIAL: <br />:APACITY: PRODUCT: R.E.H.S: <br />INITIAL INSPECTIONS <br />A <br />i <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />P <br />N <br />ALL TANKS TO BE INSTALLED AND TESTED IN ACCORDANCE <br />4. PRIMARY TANK TEST: PSI: HRS/MIN: <br />P <br />I <br />WITH MANUFACTURER WRITTEN SPECIFICATIONS <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br />R <br />T <br />16. &c0FORMANCTES4f TOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br />8. <br />0 <br />I <br />2635 <br />(a) (4)) <br />V <br />A <br />9. <br />UNUSED TANK OPENINGS SEALED AND C RR N R E TED <br />E <br />L <br />19. TANK tESSPORfS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br />0 <br />S <br />OVERSPILL PERFORMANCE TEST <br />(CCR <br />2635 <br />(b) (1) (C)) <br />ITEM OR EQUIPMENT INSPECTED <br />DATE <br />11. <br />ALL PIPING AND FITTINGS CORRO ION F EC D <br />(CCR <br />2636 <br />(b)) <br />1. UST PLANS SUBMITTED/ FEES PAID (H+S CODE 25287) <br />12. <br />PIPING SLOPES TO COLLECTION SUMP <br />(CCR <br />2. UST INSTALLATION PLANS APPROVED <br />INITIAL INSPECTIONS <br />PIPING INSPECTIONS <br />6. <br />3. INSPECTION AND TEST OF SECONDARY CONTAINMENT: HOLIDAY: <br />VACUUM: SOAP: PSI: HRS/MIN: BRINE(LIQUID ANNULAR): OTHER: <br />2636 <br />(e)) <br />14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />4. PRIMARY TANK TEST: PSI: HRS/MIN: <br />7. <br />SECONDARY PIPING CONTAINMENT TEST PSI: NRS/MI OTHER: <br />(CCR <br />5. TANK APPROPRIATELY PLACED WITH APPROVED BACKFILL (API/PEI) <br />PIPING INSPECTIONS <br />FIOAL I$SPECTION <br />6. <br />PRIMARY PIPING TEST (MINIMUM 40 PSI/30 MIN) <br />(CCR <br />2636 <br />(e)) <br />14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />7. <br />SECONDARY PIPING CONTAINMENT TEST PSI: NRS/MI OTHER: <br />(CCR <br />2636 <br />(e)) <br />16. &c0FORMANCTES4f TOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br />8. <br />LAKE TEST ON ALL SUMPS (24 HR. M y1") HRi: <br />(CCR <br />2635 <br />(a) (4)) <br />9. <br />UNUSED TANK OPENINGS SEALED AND C RR N R E TED <br />PEI <br />19. TANK tESSPORfS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br />10. <br />OVERSPILL PERFORMANCE TEST <br />(CCR <br />2635 <br />(b) (1) (C)) <br />21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br />11. <br />ALL PIPING AND FITTINGS CORRO ION F EC D <br />(CCR <br />2636 <br />(b)) <br />23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br />12. <br />PIPING SLOPES TO COLLECTION SUMP <br />(CCR <br />2636 <br />(c)(1)) <br />FIOAL I$SPECTION <br />:OMIENTS: <br />-H23-006 7/97 <br />10 <br />13. PERFORMANCE TEST FOR "ALL" MON ING PROBES (CCR 2632 (c) (2)) <br />14. PERFORMANCE TEST OF CONTINUOUS MONITORING SYSTEM (PANEL) (CCR 2632 (c) (2)) <br />15. PERF E TEST 0 LINE LEAK DETECTION (CCR 2643 (c) (1)) <br />16. &c0FORMANCTES4f TOMATIC PUMP SYSTEM SHUT-OFF (CCR 2636 (g)) <br />17. B FLOAT V LVES TALLED <br />18. OVE LL ROTE TION INSTALLED/APPROVED (CCR 2635 (b) (2)) <br />19. TANK tESSPORfS BROUGHT TO GRADE (LOCKED AND WATERTIGHT) API <br />20. TANK IMT GRITY TEST (PASSING HARD COPY) (CCR 2635 (a) (5)) <br />21. MONITORING PLAN, RESPONSE PLAN AND LOG BOOK ON SITE (CCR 2632 (d)) <br />22. "C" FORM COMPLETED AND SUBMITTED (CCR 2635 (d)) <br />23. MONITORING METHOD FOR ALL TANKS AND PIPING APPROVED (CCR 2630-2636) <br />24. ALL CONDITIONS MET; FACILITY PERMIT ISSUED (H+S CODE 25284) <br />:OMIENTS: <br />-H23-006 7/97 <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.