Laserfiche WebLink
File MH28727 Vol. I Sec., 1 ILL-1B(page 1) Issued: 2004-01-05 <br /> And Report <br /> i° <br /> s: <br /> SCEP I Identify the damaged boot and select die proper BlueHae Repair <br /> (loot band upon the number of studs and the pipe OD.(See 2006 <br /> Catalog,Section 10 and:Appendix 1) - <br /> .lr• <br /> ST Ell 2 Install all Pellethsne split components onto the pipe carefully.,AB <br /> Pellethtme pleces must be rebonded track together with Blue Seal Ail[Glue.Ibis is dome by ensuring that the surfaces are clean and dry. <br /> :Apply a liberal bead of Blue Seal and hold the seam dosed <br /> mtivrely until It Is lased.It's helpful to use tit damps to loosely <br /> hold the boot dosed during curing. Bonded connections should <br /> hold themselves closed wlthin five minutes if then are no stenoses <br /> on them.The Blue Seal glue still be fully cared in 40 minutes <br /> STEP 3 Once all Bhxline approved components are banded, apply a s -- <br /> liberal bead of 1100's to dee <br /> underside of the seal.This will make the seal with the sump wall. , <br /> insert poly ring into the Cadtet and position the ring around the <br /> oil fitting and against the sump well. <br /> STEP J Install the self lapping tek screws through the hules in the poly <br /> ting and tighten until smug,(Be carefal not to over tighten as the tits' <br /> holes can be easily stripped out) <br /> ,-.s <br /> STEP S Apply a bead of Moe Real Glue slang the Casket rim and install <br /> the boot onto the seal. Install boot wide 80 tube at dee 12:00 <br /> position.Install band clamp to inure the boot to the gasket <br /> C060438299 <br />