Laserfiche WebLink
File MH28727 Vol. 1 Sec. 1 ILL-IA(Page 2) Issued: 2004-01-05 <br /> And Report <br /> -'1'F:P G Apply a bead of Slut Seal Clue alhog the gasket rim mad install <br /> the Moot onb the neat Install boot with tlli tube at the 12.00 <br /> position.Install band clamp to secure dw bout to the gasket <br /> St FT Z Position the iruert Into the boot if applicable,but do not tighten <br /> the clamp.This connection must retain lumen tbtuu&the Illling <br /> stage to allow air to escapr <br /> 7 <br /> STF.Ptd jW the boot with Boatik 1100FS <br /> through the fill tate with the Morgue pmetanadc dispenxing ipm <br /> 7111111111111111111 <br /> until die entire cavity is full.This wM ensure that the sealant <br /> pushes back through the leak point and stop the leak. <br /> tifF.Ph Once the boot is full,tighten clamps and allow sealant to fully <br /> cure. <br /> t <br /> C060438298 <br />