Laserfiche WebLink
CCR,Tm.E 23, DMsION 3,CHAPTER 16,UNDERGROUND STORAGE TANK REGULATIONS CCR,TITLE 23,DIVISION 3,CHAPTER 16, UNDERGROUND STORAGE TANK REGULATIONS <br /> (4) The secondary containment system with backfill material shall be (2) The installer has been certified or licensed by the Contractors State <br /> designed and constructed to promote gravity drainage of an License Board; <br /> unauthorized release of hazardous substances from any part of the <br /> primary containment system to the monitoring location(s). (3) The underground storage tank,any primary piping, and any secondary <br /> containment,was installed according to applicable voluntary <br /> (5) Two or more primary containment systems shall not use the same consensus standards and any manufacturer's written installation <br /> secondary containment system if the primary containment systems instructions; <br /> store materials that in combination may cause a fire or explosion,or <br /> the production of a flammable,toxic, or poisonous gas,or the (4) All work listed in the manufacturer's installation checklist has been <br /> deterioration of any part of the primary or secondary containment completed;and <br /> system. <br /> (5) The installation has been inspected and approved by the local agency, <br /> (6) Drainage of liquid from within a secondary containment system shall or,if required by the local agency,Inspected and certified by a <br /> be controlled in a manner approved by the local agency to prevent registered professional engineer who has education in and experience <br /> hazardous materials from being discharged into the environment. The with underground storage tank system installation, <br /> liquid shall be analyzed to determine the presence of any of the <br /> hazardous substance(s)stored in the primary containment system Authority: Health and Safety Code 25299.3, 25299.7 <br /> prior to initial removal,and monthly thereafter,for any continuous Reference: Health and Safety Code 25281, 25299,40 CFR 280.20, and 280.20 through <br /> discharge(removal)to determine the appropriate method for final 280.45 <br /> disposal. The liquid shall be sampled and analyzed immediately upon <br /> any indication of an unauthorized release from the primary <br /> containment system. 2636.Design,Construction,Installation,Testing,and Monitoring Requirements <br /> for Piping <br /> (7) For primary containment systems installed completely beneath the <br /> ground surface,the original excavation for the secondary containment (a) Except as provided below,piping connected to tanks which were installed after <br /> system shall have a water-tight cover which extends at least one foot July 1, 1987, shall have secondary containment that complies with the <br /> beyond each boundary of the original excavation. This cover shall be requirements of section 2631 for new underground storage tanks. This <br /> asphalt, reinforced concrete,or equivalent material which is sloped to requirement does not apply to piping described as follows: <br /> drainways leading away from the excavation. Access openings shall be <br /> constructed as water-tight as practical. Primary containment systems (1) vent or tank riser piping, provided the primary containment system is <br /> with integral secondary containment and open vaults are exempt from equipped with an overfill prevention system meeting the requirements <br /> the requirements of this subsection. specified In sections 2635(b)(2)(B)or(C);or, <br /> (8) The actual location and orientation of the tanks and appurtenant (2) vapor recovery piping if designed so that it cannot contain liquid- <br /> piping systems shall be indicated on as-built drawings of the facility. phase product;or, <br /> Copies of all drawings,photographs,and plans shall be submitted to <br /> the local agency for approval. (3) suction piping if the piping is designed,constructed,and installed as <br /> follows: <br /> (d) Owners or their agents shall certify that the installation of the tanks and piping <br /> meets the conditions in subdivisions(1)through (5)below. The certification (A) The below-grade piping operates at less than atmospheric <br /> shall be made on a"Certificate of Compliance for Underground Storage Tank pressure(suction piping); <br /> Installation Form C" (see Appendix V). <br /> (B) The below-grade piping is sloped so that the contents of the pipe <br /> (1) The installer has been adequately trained as evidenced by a certificate will drain back into the storage tank if the suction is released <br /> of training issued by the tank and piping manufacturers; (gravity-flow piping); <br /> 3-15 3-16 <br />