Laserfiche WebLink
SWRCB, January 2002 <br />Test Method Developed By: <br />Test Method Used: <br />Test Equipment Used: ?(� s <br />Piping Material: <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />Method and location of <br />piping -run isolation: <br />Wait 'me between applying <br />ess vacuum/water and <br />C <br />5. SECONDARY PIPE TESTING <br />At iping Manufacturer <br />Other (Speck) <br />Pressure <br />Other (Spec) <br />Page -3 of '% <br />Industry Standard I_. Professional Engineer <br />G Vacuum Hydrostatic <br />tit( cru c I.. X N iq-VU eV} <br />Piping Run # 2 Piping Run # Z <br />�Iiz�v <br />73 <br />t f 1 <br />YDS- l2c.)' A p p roX, (3 z) � <br />T2 &e! ti <br />-P514- bob -.; 4 TrS4heeo-.,?-I•- <br />St la siAAA,9 1 S -I_p . <br />Equipment Resolution: 10 <br />Piping Run # 3Piping Run # f <br />F`��zQUM-1 <br />/� e) k v- <br />41b t t <br />Test Start Time: <br />�^ <br />3rvX.`)t�PSt10 <br />Initial Reading (R1): <br />I �i u IJ i�'"1i?Suwinx <br />"t .Test <br />i_. <br />startin test: <br />/� e) k v- <br />41b t t <br />Test Start Time: <br />�^ <br />Initial Reading (R1): <br />>. 7 <br />"t .Test <br />End Time:�Final <br />Reading (RF) <br />�"J al <br />��S .1 <br />WPassD <br />Test Duration:Change <br />in Reading (Rr-R,):C <br />Threshold or <br />Criteria: <br />/aSPass/Fail <br />�l tJ ldvs iv, i�4.�`- <br />N d to S5 i� �..rAJ6 <br />LOSTest <br />Result: <br />Pass D Fail <br />Pass 0 frail <br />Pass ❑Fall <br />ss ❑Fail <br />Comments — (include information on repairs made <br />prior to testing and recommended follow-up for failed tests) <br />