Laserfiche WebLink
. . <br />SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page `t of _1 <br />Test Method Developed By: Sump Manufacturer C Industry Standard rofessional Engineer <br />Other (Specify) <br />Test Method Used: _ Pressure : Vacuum hydrostatic <br />Other (Specify) <br />Test Equipment Used: C4t aW e1 / <br />Equipment Resolution: v Z <br />Sump #I-- Qjef <br />Sump # Z --'5u ac; <br />Sump #,3 —,D / e <br />Sump # <br />Sump Diameter: <br />q2_1, <br />r, <br />Sump Depth: <br />S[ t <br />�l °� <br />s -7j 10 <br />Sump Material: <br />Lv v' /SSS <br />�e ,y S <br />j�', I.n 1 e 14 Ss <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />12'� v �7ur <br />16 't // l,a✓r <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Dr <br />Portion of Sump Tested' <br />.7 t3 11 <br />W qT �'� r <br />I ►r <br />? <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />product and water)?$ <br />es ❑ No O NA <br />NA <br />/ 1 <br />._ <br />f ;'es O No DNA C Yep ❑ No O NA <br />Turbine shutdown response time <br />Na.oc <br />art; <br />A&" cl <br />Is system programmed for fail-safe <br />shutdown? <br />JKYes U' No O NA <br />Yes ❑ No ❑ NA <br />F es 0 No G NA 0 Yes � N¢ O NA <br />Was fail-safe verified to be <br />o erational?® <br />O Yes -No ❑ NA <br />O Yes ,No O NA <br />O Yes XNo O NA O Yes No O NA <br />Wait time betwenater'y'ng <br />pressure/vacuumd starting <br />test: <br />/d i dt . krC14 r'-3 <br />16 r �t et P- -'S <br />+ <br />116 40 r1�relif � <br />Test Start Time: <br />8„” / <br />0 ; �-d <br />7 ,' ud <br />Initial Reading (Rt): <br />4 c� G? I <br />d ®1 <br />e 0&1 1 <br />Test End Time: <br />j ; G' (� <br />, S—C) <br />T ! a6 <br />Final Reading (RF): <br />e) <br />, o e5 <br />Test Duration: <br />38 ry1 rte. rS <br />� p ►rtftG� -Ae 9 <br />3�5 A/ i tt ct I -e.5 <br />Change in Reading (RF -Rt): <br />Pass/Fail Threshold or Criteria: <br />, to a 3� 1�t ; r, , <br />f e)6 51 �0 ®fir tyt , <br />;®a ' 76 , y, <br />Test Result: <br />><Pass ❑ Fail <br />_,R -Pass ❑ Fail <br />ass O Fail Pass OF <br />Was sensor removed for testing? <br />Yes G No NAYes <br />i No i:: NA <br />y) es f No 7 NA i Yes i� No C NA, <br />Was sensor properly replaced and <br />verified functional after testin ? <br />es No _ NA <br />Yes !:.- No ^ NA <br />Yes No - NA Yes `_ No C' NA l <br />Com ments — (include it fbrmatlon on repairs made prior to testing, and recommended follow-up jbr f riled tests) <br />It the ,:mire depth ofthe romp i5 nut te,;ted, specify how much .vas tested. Ifthe answer to any ofrlte yuesti,ms indicated .vith ,ut <br />::aeni,k (') is 'pit)" or -NA". the .:mire sump nTUst tie tested. (See sl,� RC'13 1.(1-160) <br />