My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
1721
>
2300 - Underground Storage Tank Program
>
PR0232355
>
COMPLIANCE INFO_2005-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 4:16:46 PM
Creation date
6/23/2020 6:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2009
RECORD_ID
PR0232355
PE
2361
FACILITY_ID
FA0000591
FACILITY_NAME
QUIK STOP MARKET #2152
STREET_NUMBER
1721
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
062-060-48
CURRENT_STATUS
01
SITE_LOCATION
1721 S CHEROKEE LN # 1
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232355_1721 S CHEROKEE_2005-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
338
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: Quik Stop#152 1721 S Cherokee Ln,Lodi CA( 0054219) <br /> 6. Contact Aris Cacapit(468-3453)to arrange the following inspection(s)(a 48-hour notice <br /> is required): <br /> a. The EHD must witness the functionality of the monitoring system to ensure that <br /> monitoring has been restored to meet the requirements of California Code of <br /> Regulations Title 23 and the Health& Safety Code. <br /> 7. If concrete is being broken near the UST or piping,pipeline and or tank integrity testing <br /> must be performed by a SWRCB licensed tank tester in accordance with the <br /> manufacturer's guidelines. Results must be received by the EHD within seven days of <br /> returning the facility to operating condition. <br /> 8. If electrical penetration is added to UDC, a 24 hour lake test or its equivalent will be <br /> required to be witnessed by this office. <br /> 9. An"Underground Storage Tank Certification of Installation/Modification" form(form C) <br /> shall be submitted by the owner or the owners'agent [pursuant to(CCR) 2635(d)]before <br /> this upgrade will be considered complete by EHD. <br /> 10. Permit expires 180 days from date of approval. If an extension to the expiration date is <br /> required, a written request must be submitted to the EHD prior to the expiration date. <br /> Thank you, <br /> O�t— <br /> Aris Cacapit,EHS <br /> Environmental Health Specialist <br /> 600 E. Main St. <br /> Stockton,CA 95202 <br /> (209)468-3453 <br /> acacapit@sjcehd.com <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.