Laserfiche WebLink
Apr 08 04 09;57a <br />6 HUMZlcKER <br />September 27, 2000 <br />Phillip ESmith - <br />Phil-titeEnberprisea <br />3732Electro Way <br />Redding, CA, 9GUU2 <br />Alan C. Lloyd, Ph.D. <br />09 537 1573 <br />CARB Certification of Alternate Location ofDrop-tube inthe PWl-tite850OSeries Spill <br />Containment Buckets For Phase |Vapor Recovery Systems. <br />p,4 <br />Phil Smith of Phil-tite Enterprises requested CARIB certification for analternate location of the <br />drop -tube assembly within the Phil-tite 8500 Series spill containment buckets for Phase I vapor <br />recovery systems. |nthe proposed configuration,the drop -tube would bolocated below the spill <br />containment bucket and allow any liquid in the spill containment bucket to drain into the drop - <br />tube instead of the interstitial space between the drop -tube and the walls of the Phase I riser. In <br />this location, the drain valve isisolated from the underground storage tank and the drain valve's <br />operation isunaffected bwLIST pressure. <br />Ex|etingConfiouraton <br />Dn3p-iubeLocated <br />DvecVyBe|ovvPhase | <br />Admpie/ <br />Printed on Recycled Paper <br />Propuue6Cnnfinu/a�on <br />Drop -tube Located <br />