Laserfiche WebLink
.V- <br /> T . -- ,._.m. _eve.Series. <br /> , hest Performance,.: <br /> dost Ric ruest c *c-ai Lite_tea etactor- _rr�Pt-Tadayit <br /> Any Fuel <br /> - Any Pump's 1 <br /> • Any Pipeline System* <br /> • Longest length Pipeline System* <br /> • Largest Volume Pipeline System x' <br /> • Integrated Check Valve / -- <br /> Pressure relief <br /> *see technical.specification - <br /> MMIThe.99 LD 2000 <br /> The 99 LD-2000 is now the, most requested mechanical line leak detector built today. New <br /> engineering and the VM12-year warranty (after it stallatio-n) make the 99 LD-2000`more <br /> � . <br /> attractive to station operators today,than.evei before. Not only,is-the-.99 L®-2000 fess ex- <br /> pensive.to own, it is faster and fess subject to4field-and tine`variables than ever before! <br /> _lnfiegrated Ip-Line Check.Valve/ Pressure Relief <br /> Leaking check valves-in the turbine, defectiv&submersible pumppressure.relief, or a defec- <br /> tive..bypass valve will allow the line system to depressurize, resetting the leak detector. <br /> Dram back into the..purrrp or thermal ronfrazt on will cause vapor pockets to form. Vapor <br /> y.pocl�Ets increase rhe iehgth of t7mo Jt�akes ��Fa leak.detectt�r to open-to full flow. Pump- <br /> .Probt&ns such as these result in-slow flow and'technical"support calls. The resulting service <br /> costs:and customer di5safi�st�orr_all�taarorrr tiYfiomrne-=making rrioney. <br /> - <br /> Capab1e-- f of digin -Line-Pressure After.the Pump is Off- <br /> 06 Even with mp Cep _ ! ' fear r Faire. <br /> "Patent pending __ _.. _. _ <br /> f ' <br />