My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2512
>
2300 - Underground Storage Tank Program
>
PR0232418
>
COMPLIANCE INFO_2011-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2023 2:16:02 PM
Creation date
6/23/2020 6:55:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2018
RECORD_ID
PR0232418
PE
2361
FACILITY_ID
FA0004064
FACILITY_NAME
WATERLOO LIQUOR
STREET_NUMBER
2512
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14128102
CURRENT_STATUS
01
SITE_LOCATION
2512 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232418_2512 E WATERLOO_2011-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
429
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the submersible pump problems encountered wit out an in-line check valve, <br /> the metering.portion of the leak deflector is hammered_by hydraulic shock. This results in <br /> many leaks going undetected. Those leak detectors are j_Utt not-equiped for the job you <br /> purchased them for <br /> The 99 LD-2000 is.the--answer_youu,have been looking for .VMI, leak detectors, with an inte- <br /> grated check valve_anrl_pr_essure re iiefvalve; -save rrioney_and_reduce customer frustra- <br /> tion at the dispenser.and reduce service calls . <br /> The 9 ' _ <br /> Has kHigher:Ceve[-Of Perlariiiance"Over A,broader Range of Burial Depth, Line Length, <br /> And Piping System Types-Than Any;Other Lead Detector <br /> Additional Features <br /> • Over 20% increased flow capacity <br /> • Guaranteed''for 2 months from dafe::of installation to detect,3 GPH @10.PSI leak <br /> • One Way Poppet.YY PCEth .. ..:.._ _. .-. . - <br /> • Reverse Ratio Piston %-Poppet comiinaion <br /> • :Smaller Volume -"FasterResponse piston-size .. <br /> • Shortest.profile leak detectr�r-ava�ilable for:"tight" installations <br /> • All.fuels-(_gasoline_"-.diesel aleph®l.j�_,:� <br /> f <br /> - All._pip-pip -4f[.exible. fiberglass steely up to 400 ml resiliency <br /> • Exceeds EPA regulations (3 GPH <br /> • Detects leaks up to 10' above-the leak detector <br /> Installs with 2 1/1b" six point socket or pipe wrench <br /> Increased Flow;Capacity <br /> • Tie 99 19-2000 has maximized-the flow and flow path in existing, older submersible pump <br /> heads. This new.design allows over 20% more.:flow than_previous LD -2000 models, maximiz- <br /> ing;pump-performance for earlier_,pump-heads,. <br /> Longest Guarantee <br /> • The 99 tD 2000 shares the:=longest_guarantee available in the gndustry, along with all ofher <br /> UMI'99 LD-2000 Series teak`deteetors.'Fpr 24 months`=frorim elate of instaltataon, the LD-2000 is <br /> guar stet d t si <br /> The One Way-P6 ppet71ow---,Pa'tYisolates pomp turbulenceTrorri line Eeak detection at pump <br /> - - - <br /> stackttp� lie_ e e o does=not.-dirsii [1 ems: e bemuse of- <br /> thermat conditions encountered:during_station'operation.�(precision metering change is <br /> insignificant down.to =20°._f).: y._a . W_.0 - _. __ . ...... _ <br /> **Patent pending . v <br /> e t <br /> b a 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.