Laserfiche WebLink
® LEAK RESPONSE PLAN <br />IFUTITEWRiM <br />IT IS THE PURPOSE OF THIS SECTION TO ESTABLISH BASIC GUIDELINES AND PROCEDURES FOR USE BY THE EQUILON <br />ENTERPRISES, LLC. FOR THE HANDLING OF PRODUCT SPILLS/LEAKS WHICH MAY OCCUR AT EQUILON FACILITIES. <br />DESIGN AND INSTALLATION IMPROVEMENTS ARE CONTINUOUSLY BEING EVALUATED AND IMPLEMENTED IN ORDER <br />TO REDUCE, AND ELIMINATE, THE POTENTIAL FOR PRODUCT LEAKAGE. <br />RESPONSIBLE EQUILON PERSONNEL <br />NAME <br />TITLE <br />Paul Guevera Manager <br />Aura Mattis SH&E Coordinator <br />Alex Perez Environmental Engineer <br />Brett Hovland Project Engineer <br />1.� <br />Services <br />36 N. Hazel #108 <br />Fresno CA 93722 <br />800-552-7503 <br />LEAK VERIFICATION <br />PHONE <br />Day: 209-835-7608 <br />24hr:209-839-9738 <br />Office: 510-335-5026 <br />Pager: 800-656-9726 <br />Office: 510-335-5027 <br />Pager: 800-462-7512 <br />Office: 510-335-5032 <br />Pager: 510-840-2426 <br />WHEN A SERVICE STATION PRODUCT LOSS IS SUSPECTED OR REPORTED, THE FOLLOWING LEAK VERIFICATION <br />PROCEDURES WILL APPLY: <br />1. THE EQUILON ENGINEER WILL ARRANGE FOR THE EQUILON TERRITORY MANAGER TO IMMEDIATELY <br />(THE SAME DAY) VISIT THE STATION TO REVIEW THE DEALER'S PHYSICAL CONTROL OF PRODUCTS AND <br />INVENTORY RECORDS. <br />2. AT THE SAME TIME, THE ENGINEER WILL ORDER A PUMP/DISPENSER CALIBRATION, ASSURE METERS <br />ARE SEALED, INSPECT ACCESSIBLE POTENTIAL LEAK SOURCES, AND CHECK LEAK DETECTOR <br />OPERATION (ON REMOTE SYSTEMS). <br />3. ALSO, THE ENGINEER SHALL START MAINTAINING A PRODUCT LOSS LOG AS WELL AS A RECORD OF <br />SIGNIFICANT DAILY LEAK RELATED ACTIVITIES. <br />4. IF THE ABOVE INVESTIGATIONS PROVE INCONCLUSIVE, THE TERRITORY MANAGER SHOULD <br />IMMEDIATELY BEGIN A DAILY INVENTORY LOG (EXHIBIT B), WHICH WOULD BE MAINTAINED FOR A <br />MINIMUM PERIOD OF 48 HOURS AND A MAXIMUM OF 7 DAYS, FOR SUBSTANTIATION OF A SUSPECTED <br />LEAK. DEPENDING ON THE CIRCUMSTANCES (POTENTIAL HAZARDOUS CONDITION, ETC.), IT MAY BE <br />NECESSARY TO TAKE ADDITIONAL LEAK RESPONSE ACTION DURING THE PERIOD OF INVENTORY. <br />5. IF PRODUCT LOSSES ARE VERIFIED, PRODUCT LINES AND/OR TANKS MAY REQUIRE TESTING TO <br />DETERMINE THE LEAK SOURCE. <br />