My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_1990-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 1:17:18 PM
Creation date
6/23/2020 6:55:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2003
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_1990-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />A. PRODUCT LINES MAY BE TESTED USING AIR PRESSURE (APPROXIMATELY 50 PSI) OR A Equilon <br />APPROVED LINE TESTING SYSTEM (E.G., KENT-MOORE). SHOULD THE LINE TESTS INDICATE <br />LEAKING LINES, THEY SHALL BE REPAIRED OR REPLACED AND RETESTED TO ASSURE THE LEAK <br />HAS BEEN STOPPED. IN ADDITION, A PRODUCT LOG INVENTORY CHECK SHOULD BE MAINTAINED <br />FOR A PERIOD OF 7 DAYS AFTER THE LINE REPAIRS TO ASSURE THERE ARE NO OTHER LEAKS IN <br />THE SYSTEM. <br />B. SHOULD THE TEST INDICATE THE LINES ARE NOT LEAKING OR IF A SHORTAGE CONTINUES AFTER <br />THE LINES HAVE BEEN REPAIRED, THE UNDERGROUND TANK(S) SHALL BE TESTED BY A <br />PRECISION OR OTHER APPROVED PROCEDURE. (SEE N.F.P.A.329). <br />NOTE: LOCAL FIRE CODES AND ORDINANCES MAY DICTATE THE APPROPRIATE TESTING PROCEDURES FOR USE <br />ON UNDERGROUND TANKS. AIR TESTS OF UNDERGROUND TANKS ARE NOT RECOGNIZED AS <br />CONCLUSIVE, ARE DEEMED UNSAFE BY MANY FIRE PREVENTION AGENCIES, AND SHOULD NOT BE USED. <br />IF THE TANK TEST INDICATES ONE OR MORE TANK LEAKS, REPAIR OR REPLACEMENT WILL BE <br />COMPLETED. <br />CORRECTIVE ACTION <br />1. THE EQUILON ENGINEERING STAFF SHALL TAKE IMMEDIATE ACTION TO STOP, CONTAIN, AND SHALL <br />TAKE IMMEDIATE DECISIVE ACTION TO RELIEVE THE THREAT OF PUBLIC HEALTH AND SAFETY <br />HAZARDS, OR PROPERTY DAMAGE. <br />2. IT MAY BE APPROPRIATE TO OBTAIN SAMPLES OF THE RELEASED PRODUCT FOR TESTING AND <br />IDENTIFICATION BY EQUILON LABORATORY. <br />3. OBSERVATION WELLS WILL ONLY BE INSTALLED WITH HEAD OFFICE, MARKETING ENGINEERING, <br />ENVIRONMENTAL GUIDANCE. IF LOCAL AUTHORITIES AND/OR CONDITIONS DEMAND IMMEDIATE <br />INSTALLATION, THEN INSTALL THE TEST WELLS IN ACCORDANCE WITH STANDARDS SHOWN FOR <br />MINIMUM FOUR INCH PVC PIPE WITH INSTALLATION. <br />IF FORCED, BY SITUATION, TO INSTALL OBSERVATION WELLS OFF SITE ON PUBLIC PROPERTY, <br />ACQUIRE LOCAL AUTHORITY APPROVAL OR WRITTEN ORDER TO PERFORM THE WORK. <br />4. OBSERVATION WELL INSTALLATION STANDARDS (SEE OBSERVATION WELL DETAIL ATTACHED). <br />A. INSTALL OBSERVATION WELLS IN LOCATIONS SPECIFIED AND/OR APPROVED BY HEAD OFFICE, <br />MARKETING ENGINEERING, ENVIRONMENTAL. <br />B. DRILL (AUGER) A MINIMUM 12 -INCH DIAMETER HOLE TO A DEPTH OF AT LEAST 5 FEET BELOW <br />THE MINIMUM WATER TABLE. <br />C. INTO THE HOLE, INSTALL 4 -INCH OR 6 -INCH DIAMETER SCHEDULE 40 SLOTTED AND BLANK PVC <br />PIPE, WITH PIPE SIZE DEPENDENT UPON THE SITE'S GEOLOGY AND LOCAL REGULATIONS. <br />SLOTTED PIPE SHALL HAVE FACTORY CUT TWENTY THOUSANDTHS (.020) INCH SLOTS. <br />D. USE SLOTTED PIPE FROM THE BOTTOM OF THE WELL HOLE TO APPROXIMATELY 3 FEET ABOVE <br />THE MAXIMUM GROUNDWATER TABLE, CONSIDERING WATER TABLE FLUCTUATION. THE <br />SLOTTED PIPE SHALL BE CAPPED AT THE BOTTOM. <br />E. THE BLANK PIPE SECTION ATTACHED TO THE TOP OF THE SLOTTED PIPE AND EXTENDS UPWARD <br />TO JUST BELOW GRADE ELEVATION. AVOID USING GLUE TO COUPLE THE PIPE SECTIONS; <br />RATHER, USE THREADED PVC PIPE OR OTHER COUPLING METHODS WHENEVER POSSIBLE. A <br />LOCKABLE CAP SHALL BE INSTALLED ON TOP OF THE BLANK PIPE. <br />
The URL can be used to link to this page
Your browser does not support the video tag.