My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1990-2003
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_1990-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 1:17:18 PM
Creation date
6/23/2020 6:55:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1990-2003
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_1990-2003.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. <br />v <br />11 <br />PART II, ALTERNATE A Attachment A <br />DESIGN AND OPERATING INFORMATION Page 6 of 8 <br />ONSHORE FACILITY (EXCLUDING PRODUCTION) <br />[Response to statements should be: YES, N0, or NA (Not Applicable).] <br />Facility Transfer Operations, Pumping, and In -plant Process <br />1. Corrosion protection for buried pipelines: <br />(a) Pipelines are wrapped and coated to reduce corrosionNO <br />(b) Cathodic protection is provided for pipelines if determined <br />necessary by electrolytic testing. NO <br />(c) When a pipeline section is exposed, it is examined and <br />corrective action taken as necessary. YES <br />2. Pipeline terminal connections <br />marked if the pipeline is not <br />for extended periods. <br />are capped or blank -flanged and <br />in service or on standby service <br />NA <br />Describe criteria for determining when to cap or blank -flange: <br />3. Pipe supports are designed to minimize abrasion and corrosion and <br />allow for expansion and contraction. NA <br />Describe pipe support design: <br />4. Describe procedures for regularly examining all under -ground <br />valves and pipelines (including flange joints, valve glands and <br />bodies, catch pans, pipeline supports, locking of valves, and <br />metal surfaces): <br />1. Product lines and line leak detectors are tested annuallv. <br />2. Impact valves are checked annually. <br />3. All accessible piping systems and dispensers are inspected <br />weekly for leaks. <br />4. Electronic Alarms continuously monitor both primary and <br />secondary piping for leaks. <br />5. Describe procedures for warning vehicles entering the facility to <br />avoid damaging above -ground piping: <br />NA <br />Name of facility Grant Line Tracy Shell <br />Operator Carl Cox - Dealer <br />(Part :.1, Alternate A) Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.