My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 2:40:22 PM
Creation date
6/23/2020 6:56:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2375\PR0232469\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-27-2011 15:32 Se ice Station Systems 408 938 8888 P.03 <br /> 1. FACILITY INFORMATION <br /> Facility Name: Shell#136187 Date of Testing: 6/28/11 <br /> Facility Address; 2375 W Grant Line Road—Tracy,CA 95376 <br /> Facility Contact; I Phone: <br /> Date Local Agency was Notified of Testing; SB989—Repair/Retest <br /> Name of Local Agency inspector(ii present during testing); <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name;ABLE Maintenance,Inc. <br /> Technician Conducting Test: Kelly Burninghaan ICC#52.50610—t_J_t <br /> Credentials; ® CSLB Licensed Contractor 11 SWRC13 I.1censed Tank Tester <br /> License'rype:A,B,Haz.,CIO license Number; 312844 <br /> M.an ufasturer.Training <br /> Manufacturcr Component(s) Date Training Fx ire.+ <br /> Available upon request <br /> 3. SUMMARY OF TEST RESULTS <br /> Component: Pass Fail Not Repairs Component: Pass Fail Not Repairs <br /> Tested Made Tested Made <br /> 87 A Secondary Product ! ❑ ❑ ® ❑ ❑ ❑ Q <br /> 89 A Secondary Product ® ❑ ❑ ❑ D ❑ ❑ <br /> 91 A Secondary Product ® ❑ Q ® ❑ O D ❑ <br /> Die-set A Secondary Product ® ❑ ❑ ® ❑ ❑ ❑ ❑ <br /> 5713 Secondary Product ® p 0 ® ❑ ❑ ❑ ❑ <br /> 89 B Secondary Product 0 ❑ ❑ LSI ❑ ❑ ❑ ❑ <br /> 91 B Secondary Product 0 ❑ ❑ ❑ D ❑ ❑ <br /> 87 A Turbine Sump IM ❑ ❑ ® ❑ ❑ ❑ ❑ <br /> 89 A Turbine Sump 0 p ® M ❑ ❑ ❑ ❑ <br /> 91 A Turbine Sump ® ❑ ❑ ® D ❑ ❑ Q <br /> Diesel A Turbine Sump ® ❑ ❑ ® ❑ D Q 0 <br /> 87 B Turbine Sump ® ❑ ❑ ® ❑ 1 ❑ ❑ ❑ <br /> 59 B Turbine Sump ® Q p ® ❑ D ❑ ❑ <br /> 91 B Turbine Sump ® 0 ❑ t ❑ ❑ ❑ ❑ <br /> 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> Pump test truck used for testing <br />
The URL can be used to link to this page
Your browser does not support the video tag.