Laserfiche WebLink
JUL-27-2011 15:33 Se ice Station Systems 408 938 8888 P.04 <br /> 4. SECONDARY PIPE TESTING <br /> Test Method Developed By: © Pipinp Manufacturer ® industry Standard p Professional Engineer <br /> El Other(specify) <br /> Test Method Used: ® Pressure ❑ Vacuum p Hydrostatic <br /> p Other(Spcco) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5%of span <br /> Piping Run#87 A Piping Run#871:3 Piping Run#89 A Piping Run#89 F3 <br /> Piping Material: Fiberglass Fiberglass fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron Ameron <br /> Piping Diameter; 3" 3" 3" 3" <br /> Length of Piping Run: 100, 100, 100, 100' <br /> Product Stored: Gasoline Gasoline Gasoline Gasoline <br /> Method and location of <br /> piRing-run isolation: Reducer Boots/Fittings Reducer Boots/fittings Reducer Souts/Fittings Reducer Boots/Fittings <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 10:00 am 10:00 am 10:00 am 10:00 am <br /> Initial Reading(RT): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 11:00 am 11:00 ant 11:00 am 11:00 am <br /> Final Reading(Rr): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R,): None None None None <br /> Pass/Fail Threshold or No Detectable Loss No Detectable moss No Detectable Loss No Detectable Loss <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail El Pass 0 Fail El Pass ❑ Fail ® Pass El Fail <br /> Comments—(include information on repairs made prior to leslfn , and reeommendedfollow-u forfailed tests <br /> Replaced test boots,all passed. <br />