Laserfiche WebLink
JUL-27-2011 15:33 Se ice Station Systems 408 938 8888 P.05 <br /> 5. SECONDARY(PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer 0 Industry Standard p Professional]engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5% of span <br /> zoiam <br /> Piping Run#91 A Piping Run#91 B Piping Run#Diesel <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: Y Y 3" <br /> Length of Piping Run: 100, 100, 100, <br /> Product Stored: Gasoline Gasoline Diesel <br /> Method and location of Reducer Bootsffittines Reducer Boots/Fiffings Reducer Boota/Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 10:00 am 10:00 am 10:00 am <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi <br /> Test End Time: 11:00 am 11:00 am 11:00 am <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour I hour <br /> Change in Reading(RF-Ri): None None None <br /> Pass/Fail Threshold or No Detectable Loss No Detectable Loss No Detectable Loss <br /> Criteria: <br /> Test Result: IM Pass a Fail Q Pass ❑ Fail 91 Pass ❑ bail <br /> Comments—(irrcdude information on repairs made prior to testing, and recommendedfollow-up for failed test <br /> Replaced test boots,all passed. <br />