My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 2:40:22 PM
Creation date
6/23/2020 6:56:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\G\GRANT LINE\2375\PR0232469\FINAL JUDGMENT 11-06-09.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL-27-2011 15:33 Se ice Station Systems 408 938 8888 P.05 <br /> 5. SECONDARY(PIPE TESTING <br /> Test Method Developed By: ❑ Piping Manufacturer 0 Industry Standard p Professional]engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ® Pressure ❑ Vacuum ❑ Hydrostatic <br /> ❑ Other(Spec) <br /> Test Equipment Used: Test reducer boots,Nitrogen and gauges Equipment Resolution: 0.5% of span <br /> zoiam <br /> Piping Run#91 A Piping Run#91 B Piping Run#Diesel <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron Ameron <br /> Piping Diameter: Y Y 3" <br /> Length of Piping Run: 100, 100, 100, <br /> Product Stored: Gasoline Gasoline Diesel <br /> Method and location of Reducer Bootsffittines Reducer Boots/Fiffings Reducer Boota/Fittings <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 10 minutes 10 minutes 10 minutes <br /> starting test: <br /> Test Start Time: 10:00 am 10:00 am 10:00 am <br /> Initial Reading(Rj): 5 psi 5 psi 5 psi <br /> Test End Time: 11:00 am 11:00 am 11:00 am <br /> Final Reading(RF): 5 psi 5 psi 5 psi <br /> Test Duration: 1 hour 1 hour I hour <br /> Change in Reading(RF-Ri): None None None <br /> Pass/Fail Threshold or No Detectable Loss No Detectable Loss No Detectable Loss <br /> Criteria: <br /> Test Result: IM Pass a Fail Q Pass ❑ Fail 91 Pass ❑ bail <br /> Comments—(irrcdude information on repairs made prior to testing, and recommendedfollow-up for failed test <br /> Replaced test boots,all passed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.