Laserfiche WebLink
6. PIPING SUMP TESTING <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Incon Sump <br />Tester Equipment Resolution: +/- 0.002" <br />STP Sump # 87-A STP Sump # 89-A STP Sump # 91-A STP Sump # Diesel <br />Sump Diameter: <br />42" 42" 42" 42" i <br />Sump Depth: <br />31" <br />31" <br />31" <br />31" <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Height from Tank Top to Top of <br />13" <br />13" <br />12" <br />13" <br />Highest Piping Penetration: <br />Height from Tank Top to Lowest <br />1957 <br />21" <br />21" <br />21" <br />Electrical Penetration: <br />Condition of sump prior to testing: <br />Good <br />Good <br />Good <br />Good <br />Portion of Sump Tested' <br />2" above piping <br />2" above piping <br />2" above piping <br />2" above piping <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />❑ Yes ❑ No U NA <br />❑ Yes ❑ No U NA <br />❑ Yes ❑ No U NA <br />❑ Yes ❑ No U NA <br />product and water)?' <br />Turbine shutdown response time <br />N/A <br />N/A <br />N/A <br />N/A <br />Is system programmed for fail-safe <br />❑ yes ❑ No U NA <br />❑ Yes ❑ No U NA <br />❑ Yes ❑ No U NA <br />❑ Yes [] No U NA <br />shutdown?* <br />Was fail-safe verified to be <br />operational?* <br />❑ yes ❑ No U NA <br />❑ Yes ❑ No U NA <br />❑ Yes ❑ No ®NA <br />❑ Yes ❑ No U NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />test: <br />Test Start Time: <br />11:03 am <br />Initial Reading (RI): <br />3.7843 <br />Test End Time: <br />11:18 am <br />Final Reading (RF): <br />3.7826 <br />Test Duration: <br />15 min. <br />Change in Reading (RF-Rl): <br />0.0017 <br />Pass/Fail Threshold or Criteria: <br />+/-0.00211 <br />+/-0.002" <br />+1-0.00211 <br />+/-0.002" <br />Test Result: <br />© Pass ❑ Fail <br />❑ Pass 21 Fail <br />❑ Pass M Fail <br />❑ Pass ® F_ 7 <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ RA <br />Was sensor properly replaced and <br />® Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes ❑ No ❑ NA <br />verified functional after testis ? <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure isnot part of the Secondary Containment testing scope of work". <br />89-A, 91-A, & DSL — Failed, due to torn test boots. <br />207 1 <br />x: <br />C <br />' If the entire depth of the sump is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire sump must be tested. (See SWRCB LG -160) <br />