My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 4:12:21 PM
Creation date
6/23/2020 6:56:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VENTILATE YOUR AREA > ELECTRIC TOOLS <br />WEAR SAFETY PROTECTION No > IGNITION SOURCES n <br />Ensure that the workspace is operating below <br />A ,� A the LEL (lower explosive limit) before starting <br />work. Test regularly or monitor continuously <br />A Confined -space Certification is required <br />when installing this fitting inside Tank Sumps <br />STEP 1 BEFORE BEGINNING WORK ON YOUR JOBSITE. YOU MUST <br />EVALUATE THE EXISTING SUMPS, PIPE, CONDUIT AND <br />FLEXIBLE ENTRY BOOTS YOU WILL BE RETROFITTING. <br />FOLLOW THESE STEPS: <br />A) Ensure the sump material is fiberglass or steel only. <br />B) Ensure the piping is fiberglass, galvanized steel or PVC coated steel only. <br />C) If the PVC coated conduit is Ocal-Blue brand, you must strip the PVC away from the <br />fitting area and rough up the steel conduit beneath. <br />D) Ensure that the conduit has not rusted through. This fitting should not be installed to a <br />corroded or partially corroded conduit line. In this case you must replace the conduit. <br />WHEN READY, BEGIN WORK ON YOUR JOBSITE BY ENTERING ALL THE SUMPS YOU WILL <br />BE INSTALLING THE F -SERIES RETROFIT -S FITTING IN AND: <br />E) Remove or move any components that will obstruct your access to the sump wall. <br />F) Remove any fuel, oils, contaminants, water or debris. Dispose of HAZMAT per local codes. <br />G) Secure all conduit lines by bracketing them to at least one rigidly connected conduit or the <br />riser. Do not allow conduit endpoints to move or act as a lever. <br />STEP 2 <br />Interior Bolts <br />Interior Boot <br />0 <br />(COMPLETE ❑ <br />Before starting work, ensure all fuels <br />and flammables have been removed. <br />Test/monitor your LEL's and ventilate. <br />Remove interior boot from the wall to <br />expose the fitting interior and bolts. <br />DO NOT USE TOOLS THAT <br />CAN DAMAGE THE PIPE. <br />Use a protractor or other measurement <br />tool to measure piping angles. <br />06 i -F -Series -Retrofit -S-1 5A <br />
The URL can be used to link to this page
Your browser does not support the video tag.