My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 4:12:21 PM
Creation date
6/23/2020 6:56:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP 8 <br />CCOMPLETE ❑ <br />BEAD EPDXY <br />HEAVILY ON ALL SEAMS <br />3600 DEGREES AROUND <br />FITTING BEFORE <br />CLEANUP <br />*'- PIPE CLAMP <br />SEAL YOUR FITTING <br />BODY TOGETHER. <br />Stick this assembly to the wall and apply a strong pressure to push the halves <br />together and against the wall. Epoxy should ooze from every seam and joint. Clean the <br />face of the fitting with acetone or equivalent and remove excess epoxy. You want the fit- <br />ting clean enough to remove the pipe clamp after the fitting cures. <br />Use provided pipe clamp to secure the fitting halves to each other. More epoxy may <br />ooze from the split seams as you tighten, re -clean as necessary. <br />LET THE FITTING CURE DO NOT ALLOW THE PIPE OR <br />CONDUITS TO MOVE OR TWIST DURING THE CURE STAGE <br />After a full cure, remove the pipe clamp holding the two fitting halves together. If it is <br />too difficult to remove and appears to be bonded in place, do not force it off. <br />STEP 9Water Testin : <br />CCOMPLETE ❑ <br />After the F -Series Retrofit -S Fittings are installed and have fully cured, water level test to a <br />minimum of 2" above the highest penetration fitting on the sump. Follow local regulations. <br />If this Retrofit was installed to steel sumps: <br />Re -coat and corrosion -protect any exposed steel around the fitting area. <br />0 13 6 i -F -Series -Retrofit -S-1 5A <br />
The URL can be used to link to this page
Your browser does not support the video tag.