My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2017
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
2375
>
2300 - Underground Storage Tank Program
>
PR0232469
>
COMPLIANCE INFO_2012-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 4:12:21 PM
Creation date
6/23/2020 6:56:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2017
RECORD_ID
PR0232469
PE
2361
FACILITY_ID
FA0003772
FACILITY_NAME
GRANT LINE SHELL*
STREET_NUMBER
2375
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
21402017
CURRENT_STATUS
01
SITE_LOCATION
2375 W GRANT LINE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232469_2375 W GRANT LINE_2012-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Applications <br />• Service Station <br />• Vent/Vapor Recovery <br />• Bulk Plant Terminals <br />• Fueling Terminals <br />Materials and Construction <br />All pipe is manufactured by filament <br />winding process using amine -cured epoxy <br />thermosetting resin to imp regnate strands of <br />continuous glassfi(amentswith a resin -rich <br />interior surface. The operating pressure <br />ofthe pipe is up to 250 psig (17.2 bar) with <br />continuous operating temperature to 150°F <br />(66°C). <br />Red Thread IIA is Listed with Underwriters <br />Laboratories Standard 971-2004 for <br />non-metallic underground pipingfor motor <br />vehicle (MV), high blend (HB), concentrated <br />(CT) and aviation and marine (A&M) fuels. <br />The pipe and fittings are also Listed with <br />Underwriters Laboratories ofCanada with <br />both Listings under FileMH9162. <br />Nominal Dimensional Data <br />• Central Fuel Oil Systems <br />• Marinas Terminals <br />• Ethanol Fuel Blends <br />• Biodiesel Fuel <br />Fittings <br />Fittings are manufactured with the same <br />chemical and temperature capabilities as the <br />pipe. Depending on the configurations and <br />size, the fittings construction method will <br />be compression molded, contact molded, <br />fabricated orfilamentwound and are <br />described in FH1250. <br />Testing <br />Installed pipe systems should betested prior <br />to use to assure soundness ofalljointsand <br />connections. Locate pressure gauge in close <br />proximity to the pressurizing equipment, <br />notdirectlyon the piping system. A pressure <br />gaugewith the test pressure at mid -scale is <br />recommended. <br />• Diesel Exhaust Fluid <br />• UL/ULC Systems that require MV, <br />HB, CT, A&M Fuels <br />Joining System <br />• T.A.BT"-Theprimaryjoiningmethod for <br />pipe joints promoting fast, positivemake- <br />up and prevents "backout" during curing. <br />• Bell&Spigot-Theprimaryjoining <br />method for fittingjoints. <br />These joints assist the installer and assures <br />a fast trouble-free installation. Adhesive for <br />this system is Series 8000. T.A.B. spigots can <br />be bonded into tapered bells and tapered <br />spigots can be Bonded into T.A.B. bells using <br />standard bonding procedures for tapered <br />joints. <br />ASTM D2996 Designation Code - <br />RTRP-11AW13110 <br />View of Joint Illustrations <br />T.A.B. <br />Bell & Spigot <br />Fiber Glass Systems I K*Y P �a� c,gautIana <br />U <br />fgspipe@nov.com <br />U <br />nov.com/fgs <br />Pressure/ <br />Pipe Size <br />Inside <br />Outside <br />Wall Thickness <br />Weight <br />Temperature <br />Mill Test <br />Minimum <br />Diameter <br />Diameter <br />Max. Rating at <br />Pressure <br />Bending Radius <br />150°F(66•C) <br />in mm <br />in <br />mm <br />in <br />mm <br />in <br />mm <br />lbs/ft <br />kg/m <br />psig MPa <br />psig <br />MPa <br />ft m <br />2 50 <br />2.238 <br />57 <br />2.372 <br />60 <br />0.067 <br />1,70 <br />0.42 <br />0.63 <br />250 1.72 <br />375 <br />2.59 <br />102 31.0 <br />3 80 <br />3.363 <br />85 <br />3.559 <br />90 <br />0.098 <br />2.49 <br />0.92 <br />1.37 <br />175 1.21 <br />300 <br />2.07 <br />153 46.5 <br />4 lOD <br />4.364 <br />111 <br />4.554 <br />116 <br />0.095 <br />2.41 <br />1.15 <br />1.71 <br />125 0.86 <br />2fi5 <br />1.83 <br />195 59.5 <br />6 150 <br />6.408 <br />163 <br />6.686 <br />170 <br />0.139 <br />3.53 <br />2.47 <br />3.68 <br />20 0.14 <br />265 <br />1.83 <br />287 87.4 <br />View of Joint Illustrations <br />T.A.B. <br />Bell & Spigot <br />Fiber Glass Systems I K*Y P �a� c,gautIana <br />U <br />fgspipe@nov.com <br />U <br />nov.com/fgs <br />
The URL can be used to link to this page
Your browser does not support the video tag.