Laserfiche WebLink
SWRCB, January 2002 Page of <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: X Piping Manufacturer Ei Industry StanA4 <br />�RC) d pinnal Engineer <br />N <br />E Other (Specify) 51'�P7V�r_ <br />Test Method Used: X Pressure El Vacuum 11 Hydrostatic <br />[I Other (Specify) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen <br />Equipment Resolution: 1110-15 Psi <br />Piping Run # 1 Piping Run # 2 <br />Piping Run # 3 <br />Piping Run # 4 <br />Pi M 1_ <br />Piping <br />In Material: <br />- g Material: <br />Fiberglass Fiberglass <br />Fiberglass <br />Fiberglass <br />P.P1 g M f tu r. <br />Piping Manufacturer: <br />Smith Smith <br />Smith <br />Smith <br />Piping Diameter: <br />3" 6" <br />4" <br />3" <br />Length of Piping Run: <br />120' 57' <br />55' <br />25' <br />Product Stored: <br />Regular 87 Gasoline Remote Fill <br />Gasoline Remote <br />Vapor <br />Condensed Vapor to <br />Gasoline <br />Method and location of <br />piping -run isolation: <br />Test boot at STP Test boot at <br />Piping Sump Piping Sump #2 <br />Test boot at <br />Piping Sump #2 <br />Test boot at Piping <br />Sump #2 & <br />Vapor Pot Sump <br />Wait time between applying <br />pressure and starting test: <br />5 Minutes 5 Minutes <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />8:40 8:45 <br />8:50 <br />8:55 <br />Initial Reading (Ri): <br />5 Psi 5 Psi <br />5 Psi <br />5 Psi <br />Test End Time: <br />9:40 9:45 <br />9:50 <br />9:55 <br />Final Reading (RF): <br />5 Psi 5 Psi <br />5 Psi <br />5 Psi <br />Test Duration: <br />I Hour I Hour <br />I Hour <br />I Hour <br />Change in Reading (RF -RI): <br />0 Psi 0 Psi <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi No Loss in Psi <br />No Loss in Psi <br />No Loss in Psi <br />Test Result: <br />Pass Pass <br />Pass <br />Pass <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />