My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
121
>
2300 - Underground Storage Tank Program
>
PR0232594
>
COMPLIANCE INFO_2013-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2024 3:25:01 PM
Creation date
6/23/2020 6:56:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2018
RECORD_ID
PR0232594
PE
2361
FACILITY_ID
FA0004573
FACILITY_NAME
SJ COUNTY PARKING GARAGE
STREET_NUMBER
121
Direction
S
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
14912001
CURRENT_STATUS
01
SITE_LOCATION
121 S SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232594_121 S SAN JOAQUIN_2013-2018.tif
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
192
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 Page of <br />6. SECONDARY PIPE TESTING Jut - <br />Test Method Developed By X Piping Manufacturer C.1 Industry Standardl\�� F4 �, � ngineer <br />� <br />❑ Other (Specie)F�arxQ <br />Test Method Used: X Pressure ❑ Vacuum Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1/10-15 Psi <br />MIMMMMINW Piping Run # 5 1 Piping Run # 6 Piping Run # I Piping Run # <br />Piping Material: <br />Fiberglass <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Smith <br />Piping Diameter: <br />3" <br />2" <br />Length of Piping Run: <br />110' <br />6' <br />Product Stored: <br />Gasoline Vapor <br />Siphon for Condensed <br />Vapor to Gasoline <br />Method and location of <br />piping -run isolation: <br />Test boot at UDC's & <br />Vapor Sump <br />Test boot at Vapor <br />Sump & STP Piping <br />Sum <br />Wait time between applying <br />pressure and starting test: <br />5 Minutes <br />5 Minutes <br />Test Start Time: <br />9:05 <br />9:10 <br />Initial Reading (RI): <br />5 Psi <br />5 Psi <br />Test End Time: <br />10:05 <br />10:10 <br />Final Reading (RF): <br />5 Psi <br />5 Psi <br />Test Duration: <br />1 Hour <br />1 Hour <br />Change in Reading (RF -RI): <br />0 Psi <br />0 Psi <br />Pass/Fail Threshold or <br />Criteria: <br />No Loss in Psi <br />No Loss in Psi <br />Test Result; <br />Pass <br />Pass` <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.