Laserfiche WebLink
AS <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> 49x1 <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION <br /> ago-z <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT TIES FACILITY. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S�: <br /> I. FACILITY#ORiVIAMON <br /> i <br /> FACILITY ID#(Agency Use Only) I I I - I - <br /> 3. <br /> BUSINESS NAME(Same as FACILITY NAME) UROviw$ PA 469 xQ6 R-A fit <br /> BUSINESS SITE ADDRESSA rx tvr 103 CITY S Gtw�.1 104 <br /> l21 S. S <br /> .H.:EQUTPNWNT TESTING AWD PREVENT VE MAINTIENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR§2632,2634,2638,2641) -M <br /> 490.30- <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b <br /> ::III.MONITORING LOCATIONS <br /> I.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49o-4 <br /> I�?TANIIICMO !1 UILTNG, S ',ERF® tiED�USIN(� ftEaTi01 4 A G NW OD(S)i.. <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT ago-s <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> a9o-6 <br /> SECONDARY CONTAINMENT_IS: Of a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM <br /> _ - <br /> -- - <br /> -- _ _ <br /> --- <br /> 490-7. I <br /> PANEL MANUFACTURER: V �P't11• -- MODEL#: KI•�S <br /> ---- 490-9. i MODEL#(S): a9i1 io <br /> LEAK SENSOR MANUFACTURER: V�.�.PFa <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S). 490-11(23 CCR§2643) 490-13 <br /> 190-12. MODEL <br /> PANEL MANUFACTURER: -- - ------------------------ <br /> ------- --- <br /> _- -- 490-15 <br /> IN-TANK PROBE MANUFACTURER: 490-14. 490-15 <br /> -_�_-___-_-----__-_- _-_----_-______________________________-________----____ 490-16 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLT ❑ c.WEEKLY <br /> e.OTHER(Specify): a9an <br /> ____ ___❑ d.MONTHLY_ ❑ _-------- --------------------------------- <br /> _ ---------- 0-90-18 <br /> PROGRAMMED TESTS: - ❑ a.0.1 g.p.h - ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> 490.20 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): <br /> ago-z1 <br /> E] 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49x22 <br /> 490-23 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-24 <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490-27 <br /> V.,PIPiE:MONLT0,RJ,GhI�a�PERFORIYIEDIUSI'NG OZi�LO ING I)HO�D(ilS)#(Gheak lllthat pply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WTTH AUDIBLE AND a90-z8 <br /> ISUAL ALARMS. (23 CCR§2636) <br /> a.DRY ❑b.LIQUID FILLED _❑c.PRESSURIZED ❑d.UNDER VACUUM 490-31 <br /> 29 <br /> SECONDARY CONTAINMENT IS: _ _ _--- _-_________-__---------. <br /> PANEL MANUFACTURER: J iLA tA. I;Lbw" - a9aso MODEL#: ?&.q 0-90-31 <br /> 490-33 <br /> LEAK SENSOR MANUFACTURER: V T 41-32 1 MODEL#(S): Z.v <br /> --I-----------_--- - --------- <br /> 490-3 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e. TURBINE)SHUTDOWN. <br /> a.YES ❑b.NO <br /> 490-355 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. %a.YES ❑b.NO <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED(23 CCR S2636) -__ _-__-____ -------- 490-36 <br /> MLLD MANUFACTURER(S): -R Sr& +MIM+fA1t*4'rt t 490-37 �® 490-38 <br /> G MODEL#(S): 99 L S) <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) _-- _490-39 <br /> --- - ----`_ � <br /> ELLD MANUFACTURER(S) a90ao. MODEL#(S)_ <br /> ---------......... <br /> ----- <br /> ago az <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ <br /> a.YES ❑b.NO 49043 <br /> 44 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ <br /> a.YES ❑b.NO ay0 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED- 490-49 <br /> "Allowed for monitoring of unburied ernergencu generator fuel pi2ing only per HSC 25281.5(6x3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS C CTED TO THE TANK SYSTEM <br /> 490-51 490-52 <br /> 99.OTHER(Specify) S O&S R%44CKf_ 1r VU4rJZI 490-53 <br /> MAR 2t10P 1 e5 <br /> UPCF UST-D(12/2007)1/4 8AfV1R0 <br /> R /Ti / L1 <br />