Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER'DISPENSER"CONTAINMENT-(,iJDC)MONITORIlVG <br /> a90-saa <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD ago-sat <br /> Al.CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): —___—____—_ ------------- --–– avas6: <br /> —_–. <br /> ----—— <br /> 490-55 MODEL#: '1{.$ 3SV <br /> PANEL MANUFACTURER: _ p.ODT _ _ ____ i------------------------------------- <br /> LEAK SENSOR MANUFACTURER: �T sEfAtilt Rd0T — 4 57 MODEL#(S): a. 9 490-59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS A.a.YES ❑b.NO 4945. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN CK a.YES El b.NO ay0�0 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. 19 a.YES ❑b.NO 49"1 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. JZ a.YES ❑b.NO 490-62 <br /> 49tw3 <br /> 2.UDC CONSTRUCTION IS %1.SINGLE-WALLED [12.DOUBLE-WALLED <br /> 490 64a <br /> IF DOUBLE WALLED: <br /> _UDC INTERSTITIAL_SPACE IS MONITORED BY: 1.LIQUID El2.PRESSURE []3.VACUUM A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> ❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTIONLELDj,MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 223 CCR§26,4_l�_____ <br /> 490-66 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. -----_--__ — —_ <br /> 4�3.SPILL BUCKETS ARE TESTED ANNUALLY. 490'6 <br /> M, RECORDI<E:EPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490-69a CKVisual Inspection Records 490-69b ❑Tank integrity testing results 490-69c <br /> SIR testing results(and supporting documentation records). 490-69d ❑ Tank gauging results(and supporting documentation records). 49o-69e <br /> ATG Testing results(and supporting documentation records).4go-68r ❑ Corrosion Protection 60-day logs 490-69b <br /> Equipment maintenance and calibration records. 490-69h <br /> G <br /> %Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490.69c <br /> CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69r <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> .tCO EN4TS/,ASI)aaION�L ORM ION. <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.4go-7t <br /> &4�V%LL 't."t6.rvs D*J va—V IC � a?".) Co t S o _V ^011 t s ter Q Q O%1'* 4A0*C=T y <br /> XI.<PERSONNEL,RESPONSIBI-UT]ES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME CrOaX%PAV. WMaD9e.1 490-72 TITLE 1)=OWC%4C#6 49x23 <br /> NAME �fm S. VAYlA.1 4go-74 TITLE rMw+ dlrfhr .Pr A�&4_VST 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.::OWNER/OPERAT(.R'SIGNATxURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge- <br /> APPLICANT IGN 490-76 DATE: 477 <br /> `�-497 Z -4-Z2 I, /3 <br /> REPRESEN 1.Tank Owner/O rator .FggjNW I 3 thoriu Re en alive of Own <br /> 490"79 APPLICANT TITLE: 490-79 <br /> APPLICANT NAME(print): <br /> pA.ITfl <br /> S. iry FLA& <br /> UPCF UST-D(12/2007)3/4 <br />