Laserfiche WebLink
January 28, 2015 <br />• <br />San Joaquin County <br />Environmental Health Department <br />1868 E Hazelton Avenue <br />Stockton, California 95205 <br />Website: www.sjcehd.com <br />Phone: (209) 468-3420 <br />Fax: (209) 464-0138 <br />CARL WAYNE HENDERSON <br />SERVICE STATION TESTING -SST INC <br />P.O. BOC 31465 <br />STOCKTON, CA 95213 <br />Re: TULARE FARMS, LLLP <br />2771 E FRENCH CAMP RD <br />MANTECA, CA 95336 <br />FILE COPY <br />DIRECTOR <br />Linda Turkatte, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Adrienne Ellsaesser, REHS <br />Rodney Estrada, REHS <br />SR0071417 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of the <br />application for a permit to replace the existing 87 -octane annular sensor (Veeder Root, 420) with a new <br />micro sensor (Veeder Root, 344) on the underground storage tank (UST) system at the above noted <br />address. The permit has been approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br />applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval prior to <br />commencing work. All new addenda supersede the previous ones. <br />3. Contact Elena Manzo at (209) 953-7699 to arrange the following appointments (a 48-hour notice is <br />required for inspection appointments). <br />• Sensor functionality: Functionality of the monitoring system must be verified to ensure that <br />monitoring has been restored to meet the requirements of Title 23 California Code of Regulations <br />and the Health & Safety Code. If it is determined that a cold start is necessary, a copy of the <br />alarm history shall be printed prior to performing the "cold start" of the monitoring system and <br />made available at the time of EHD inspection. <br />Please be aware that the facility cannot operate the UST system prior to the EHD inspection <br />and approval. <br />4. If concrete will be broken near the tank, a secondary containment test must be performed on the <br />tank once concrete is poured in accordance with the manufacturer's guidelines. <br />