Laserfiche WebLink
L <br />UNIFIED PROGRAM CONSOLIDATED FOJ& <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN -- (Page I of 2) Qdi *—M <br />TYPE OFACTION F.ILNEWPLANT x 2. CHANGE OF INFORMATION <br />�INIU NITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />49M7 <br />, <br />i (Check one item only) L7 2. THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM( <br />I. FACILITY INFOWMATION <br />FACTLIri, 11) 9 (Agencv Use Only) <br />BUSINESS NANIF. (Same as FACILITY NAME)TULARE FARMS 1,(L f <br />BUSINESS SITE ADDRESS 67i 0 CITY <br />ftkAX�l CAMe if <br />104. <br />11.E UIP FNT TESTING AND PREVENTIVE MAINTENT-kNCE <br />—Testh-ig, p—revei—iti-ve—niai--i-it-en—aiice,—anc-I -calibration of—mo-nitoring—equi—pm-ent (e --.g--., —sensors, probes, line leak detectors, etc.) must be performed at the frequency <br />specified by the equipment manufacturers' instructions, or annually, whichever is more frequent, and that such work must be performed by qualified personnel. <br />(�23 CCR §'632,'631. 26-3-8.,--2-64-.1-" ------------------------------------------------------------ - -.1 ---------- - -------------------------------------------------------------- ----------------------------------------- ------------- -------- <br />49n- <br />------------------------- <br />NITORING EQUIPMENT IS SERVICED L ANNUALLY r--, 99. OTHER (Specify): <br />4 <br />111. MONITOR ING LOCATIONS <br />�17N�-WSITE SITE P�LAN, NL�',PSUBT�AITTFD TRIS -`PL-k—N- -,X2—.SITE PLOT PL ­A-N-,A1AP PREVIOUSLY SUBMITTED, (23CC §2632, <br />2634)-c9 <br />IV. TAN K M ONI T 0 RIN G I S PERFORMED USING THE FOL LONVIN-11 G METHOD(S): <br />OVIS TANK ING OF ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT <br />11 . CONT WOUS ELECTRO� A� <br />J <br />49C51 <br />VAULT(S) WITH AUDIBLE AND VISUAL ALARMS. (23 CCR §2632,2634) <br />SECONDARY CONTAINMENT IS: "W a- DRY E, b. LIQUID FILLED Ei c. PRESSURIZED URIZFD Lj d. UNDER VACUUNT <br />------- ------ --------- 11 ------------------------------------------------------------------------------------------------------------------- --------------------------------- ------------------------------------------------------------------ <br />PANEL MANUFACTURER: FEEDER ROOT 4: TLS3318MODEL <br />------------------------------------------------------------------- ------------------------------------------------------------------------------------ - ------------- <br />LEAK SENSORTWANUFACTURFR: VEEDER ROOT MODEL#(S): 7943280-344/794390-420 <br />--- --- <br />2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE MAI ALIAHKJSL(23 CCR §2643) <br />490-11 <br />- <br />490-12. <br />AN MANUFACTURER: MODEL 4: <br />-------------------------------------- <br />490 I <br />------------------------------------------------------------------ <br />IN-TANK PROBE MANUFACTURER: 4M.-14 MODEL 4(S)v - ----------------------------------------------- <br />-------------------- - LE -Av h--- -'-I- 7ES --- TF --- R- E -Q- U-- E --N--T- C Y - -: ---------❑0 ------ & ---- --- IN --- U --- 0- -U- S ------------------------------------------------❑E-1 ---- b -.--D- --- A I L 1--'7- N -T- -1 - G- --- If T- --- LY- ------------------------ WEEKLYan <br />Ir <br />d. MONTHLY e. OTHER (Specify): ----------------- <br />---- <br />--- - ---------- - ----------------- --------------------------- ---------- ----------- ----------------------------❑----------------- - ------------- ----------------------------------------- <br />PROGRAMMED TESTS: a. 0. 1 g.p. h. b. 0.2 g.pA El c. OTHER (Specify): <br />490 <br />3. MONTIH,Y STATISTIC Al., ITNT'VENTORY RFCONC[IJAXION (23 CCR §2646.1): <br />49n-?' <br />4, WEEKLY MANUAL TANK GAT iCTNG (MTG) (23 CCR §2645). TESTING PERIOD: a, 36 HOURS b. 60 HOURS <br />CCR­§2-64-3.4-1�-- <br />77 -1157 ---TANK —TESTING <br />49 J�' <br />490-2� <br />INTEGRITY" (23 <br />1490-24 <br />TEST FREQUENCY: ❑F—, a- ANNUALLY F- b. BIENNIALLY ❑El c. OTHER (Specify): <br />490 - <br />L-1 99. OTHER (Specify): <br />490-26. <br />490-271 <br />V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />-AIN. <br />--711 —CONTINUOUS TVIONITCAP—JING-OF PIPEPIPINGSI—LTMP-(%) —AND OTHER —SECONDARY CONI ENT WITH AUDIBLE AND <br />490-28 <br />VISUAL ALARMS. (23CCR §2636) <br />490--29 <br />. UNDER UUM <br />-NTIS: Da. DRY Ob.LIQUID FILLED Ec.PRESSURIZED E02 <br />D---A---R---Y--- <br />-C---O--N---T---A---I-M---%--ffi------------------------- <br />----------------------------------------------------------------------------------------------------------- <br />#V-AC <br />--------- ----S--E--CO---N-- <br />ODEL <br />I PANEL MANUFACTURER: 49MM_________________..______________________-__________ <br />490-31 1 <br />1 <br />1di' <br />-- - -- -U - ---- -- --------------------------------------------------- ------ --------------------------------------------- <br />-----490-3 <br />LEAKSFNSORMANUACTURFR: MODEL g(SI: <br />9 <br />4033--------- <br />----------------- <br />i PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP (i.e., TURBINE) SHUTDOWN. ❑ a, -YES ❑ b. NO <br />µ90.3q <br />FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS A17ONIATIC PUMP SHUTDOWN. ❑ a. YES I b. NO <br />4QO-35 <br />ETECIOR (MLLD) THAT ROTENELPERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SITU TS OFF <br />NLNICAL LINE LEAK DUY <br />Ty- CH <br />T IE <br />PRODUCT FLOW WHEN A LEAK IS DETECTED (23 CCR §2636) <br />490-36 <br />------ --------------------------------------------------------------------------------------------------------------- <br />---- ------------------------------------- ------------------------------------------------------------------------------------------------- - 49o--17 <br />MLLD MANUFACTURER(S): MODEL #(S): <br />490-3S <br />3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS (23 CCR §2636) <br />---------------------- --------- ------------------------------------------------------------------------ - ---------------------------------------------- ----------------------------------------------------------- <br />490-39 <br />---------- - - ------------- - ---------------------------------- 4,n-40 MODEL g(S): <br />ELLD MANUFACTURER(S) ----------------------- ---------------------------------- <br />490-41 <br />------------- ---------------------------- -------------------- ----- ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br />PROGR-AMMED IN LINE LEAKTEST: E I.,,viiNimUMMOI-qTIILI�O.2g.p.h. El 2. MINIMUM ANNUAL 0.1 g.p. h. <br />490-4-11 <br />ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN.. YES, ❑ b. NO <br />ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ YES b. NO <br />-- <br />490A3 <br />490-44 <br />7 1 —4PIP]t-INTEGRITY —TESTING ,;90 4, <br />TEST FREQUENCY E. a ANNUALLY F_ -]b. EVERY 3 -YEARS E-1 c. OTHER (Specify) OP <br />-4n490-47- <br />-[7K --MT--TAL PIPE MONITORING, <br />On -48 <br />FREQUENCY X a. DAILY [:] b. WEEKLY D c. NUN. NIONT[ILY &EACH TD&E SYSTEM OPERATED* <br />490-49 <br />6. SUCTION PIPING MEETS EXEMPTION CRITERIA [23 CCR §2636(a)(3)]. <br />7. NO REGi� ATED PIPING PER HEALTH ANI) SAFETY COBE, DIVISION 20, CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br />49H-51 <br />❑ 99.OTBER(Specifv) <br />UPCF UST -D (12/2007) 1/4 <br />