Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORXr <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN (Page 2 of 2) <br />VL UNDER DISPENSER CON`1*N*N't W M6 TORING <br />1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br />490-546 <br />1. CONTINUOUS ELECTRONIC MONITORING [12. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />El 4. NO DISPENSERS— ❑99.OTHER (Secify): <br />---------_—____r--- — ----------------------- <br />490-55 490-56. <br />-----PANEL MANUFACTURER-- ---- Q — -- -- -- -- — -- — — — -- — — —MODEL # — �L� <br />LEAK SENSOR MANUFACTURER: 490-57 MODEL #(S): q-7 (gym®A I .—/�1-�Gple90-58 <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS DO a. YES ❑ b. NO WJ'C490-59 <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN J9 a. YES ❑ b. NO 490-60. <br />FAILURE / DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a. YES ❑ b. NO 490-61 <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ® a. YES ❑ b. NO 490-62 <br />2. UDC CONSTRUCTION IS DQ 1. SINGLE -WALLED ❑ 2. DOUBLE -WALLED 490-63 <br />IF DOUBLE WALLED: 490-64a <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ 1. LIQUID Do 2. PRESSURE [13. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a. YES ❑ b. NO 490-64b <br />vII!T ERIODIC SYSTEM TESTING <br />❑ 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br />LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 23 CCR 2644.1 <br />54 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br />---- —-----_-- -- -- ----- ------ ------------------------ <br />-— -- -- — — — -- -- — -- - — --- — <br />3 SPILL BUCKETS ARE TESTED ANNUALLY. 490-67 <br />VIII: RECORDKEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />gy Alarm logs 490-68a JKVisual Inspection Records 490-68b ❑ Tank integrity testing results 490-68c <br />El SIR SIR testing results (and supporting documentation records). 490-68d ❑ Tank gauging results (and supporting documentation records). 490-68e <br />❑ ATG Testing results (and supporting documentation records). 490-68f ❑ Corrosion Protection 60 -day logs 490-68g <br />❑ Equipment maintenance and calibration records. 490-68h <br />IX, TRAINING <br />JQ Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) 490-69b <br />OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) 490-69c <br />CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />STATISTICAL INVENTORY RECONCILIATION" 490-69f <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-691; <br />❑ OTHER (Specify): M69h, M69i <br />This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council (ICC). <br />The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 days of hire. This <br />training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br />➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br />➢ Names of contact person(s) for emergencies and monitoring alarms. 490-70 <br />X. COMMENTS/ADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. 490-71 <br />XL PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: I) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br />this plan occurs, 2) all conditions that indicate a possible release are investigated, and 3) all monitoring records are maintained properly. <br />The followi er on(s a re orisible for performing the monitoring and equipment mainten ce: <br />NAME q/` 490-72 TITLE 490-73 <br />NAME ` ` 490-74 TITLE ` ( 490-75 <br />The Designated Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />XII.OWNEWOPERATOR SIGNATVlRE <br />CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE 490-76 DATE:490-77 <br />REPRESENTING M 1. Tank Owner/O erator n 2. Facilg 0wner/overgLor lil Authoriz d Representative of Ovmer <br />APPLICANT NAME(p nt): � 490-78 APPLICA TIT 490-9 <br />`s <br />UPCF UST -D (12/2007) 3/4 <br />