Laserfiche WebLink
I a A& <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page 1 of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE I.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S) <br /> I FACILITY INFORMATION <br /> 1 <br /> FACILITY ID#(Agency Use Only) I I I - - <br /> BUSINESS NAME(Same as FACILITY NAME) 3 <br /> BUSINESS SITE ADDRESS � 1°3' CITY 104. <br /> !!d 6 <br /> II.EQUIPMENT TESTING AN16 PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR J263 , 34 <br /> __(IL 26382 - <br /> _ <br /> MONITORING EQUIPMENT IS SERVICED - 14 1.ANNUALLY ❑ 99.OTHER(Specify): 490-3b <br /> III.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM ago-6 <br /> ------------ - - - - ----- - -- ---- - -- - - <br /> _________________-____________-_--___-____-__________ __________-___ - 490 R <br /> PANEL MANUFACTURER t �C R a9oa. <br /> - - -------- <br /> 490-9.---- -- ---�- - - - - ---- -- - <br /> ----------------__-_ 490.10 <br /> LEAK SENSOR MANUFACTURER: R J� 1 MODEL#(S): .S <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-u <br /> PANEL MANUFACTURER: 490-12' MODEL#: --- 13 <br /> --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------15 <br /> - 490-la. MODEL#S : a90-t5 <br /> - - IN-TANK-PROBE MANUFACTURER-------------------------------------------------------------------M - #(-�--------------------------------------- -------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16 <br /> ago-17 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify)_- - -- -- -- - -- --- ----------- <br /> -------------- ---------- - <br /> - 490-I8 <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20490-21 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 490-21 <br /> ago-zz <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> 490-za <br /> TEST FREQUENCY: ❑ a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> 490-26 <br /> E]99.OTHER (Specify): 4 o-z7 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> ❑1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:❑a.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM ago-z9 <br /> ___________--_-_________________-___-_______-_-_-_--___----___-__-_-_-_-___ _ -_- ____-___-_-_______________-_______ 490-31 <br /> -________----______--_-_ 490.3() 1 <br /> PANEL MANUFACTURER: MODEL#: 490-33 <br /> a9oaz 1 MODEL#S) <br /> -------------------LEAK SENSOR MANUFACTURER_------- ------ ------------------------------------------------------------------------------�--=----------------------------------------- <br /> -------------------------------- - - <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ❑a.YES ❑b.NO <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO a9°-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTEDP23 CCR§2636) 490.36 <br /> ------- --------------------------------------------------------------------------------------- <br /> 490.37 490-38 <br /> MLLD MANUFACTURER(S): MODEL#(S): <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ------------------------------------------------- ----------------------------------5-- 6-----------------------------------------------------------------41 <br /> ELLD MANUFACTURER(S) a9o40' MODEL#(S): ago-at <br /> --------------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2g•P h. ❑ 2.MINIMUM ANNUAL 0.1g ph. a9o4z <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49043 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490-44 <br /> ❑ 4.PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46 490-47 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY W a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 49049 <br /> *Allowed for monitoring of unburied emergency enerator fuel piping only per HSC§25281.5(b)(3 <br /> �f 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)j. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-5t <br /> 490-52 <br /> ❑ 99.OTHER(Specify) 490-53 <br /> UPCF UST-D(12/2007)1/4 <br />