Laserfiche WebLink
a A& <br /> "UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 490-54a <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> 1.CONTINUOUS ELECTRONIC MONITORING F1 2.FLOAT AND CHAIN ASSEMBLY El 3.ELECTRONIC STAND-ALONE <br /> E]4.NO DISPENSERS 099.OTHER(Specify): ago-s5 i MODEL-# ------------------------- 490-56. <br /> PANEL MANUFACTURER: –--------- -R1 1 0- ------–-------- <br /> ------------–-–-–-—------- ------ -�i I :-----twl <br /> -_ : _71�i ------—------------–--��6_ <br /> LEAK SENSOR MANUFACTURER: Ve4V_7jL gooT 1 MODEL#(S): 11 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS 2 a.YES El b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN 9 a.YES F1 b.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES M b,NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. a.YES F]b.NO 490-62 <br /> 490-63 <br /> 2.UDC CONSTRUCTION IS 1.SINGLE-WALLED E32.DOUBLE-WALLED ------------- <br /> 490-64a <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: El 1.LIQUID Ot 2.PRESSURE 0 3.VACUUM -------–----–----------–------------------------- <br /> ------YA ALARMS El a.YES El b.NO 490-64b <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL A <br /> VII.PERIODIC SYSTEM TESTING <br /> r_1 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. CCR_§�644 I <br /> ---------- -AS_REQUIRED.–-------- -----I)------------- <br /> -------—--- --- 490-66 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. -–------------–----–---–-------–----–--------------------------------------------- <br /> 3.SPILL BiUe_1dT§akf_yKSTED ANNUALLY. 490-67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®'Alarm logs 490-68a R Visual Inspection Records 490-68b ❑Tank integrity testing results 490-68c <br /> 0 SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 490-68e <br /> [I ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-68g <br /> El Equipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> 09 Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> IM THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490-69b <br /> CN OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> 0 CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> E] CALIFORNIA UNDERGROUND STORAGE TANK LAW 490-69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> ❑ OTHER(Specify):M69h,M69i nal Code Council(ICC). <br /> fig This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the Intematio <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> > Operation of the UST systems in a manner consistent with the facility's best management practices <br /> > The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> > The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> > Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> k6XANkGJ 0JeAA011J CO-NIs, of q!40 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The followl sible for performing the monitoring and equipment maiinten IVA 490-73 <br /> . NAME KI A TJ,C1(L 490-72 TITLE _1SL fvk lint 490-75 <br /> –NAME kjCV%&JkX_ 14, 490-74 TITLE AINA; n!&ACC <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator, and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XIL OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. 490-77 <br /> APPLICANT SIM TU 490-76 DATE: <br /> I k <br /> gEPRESENTINQ1. 1.Tank 0 e rator 2.Facility 0wner/Q-­­ <br /> 490-78 TITLE: 490-79 <br /> APPLICANT NAME print): APPLICANT <br /> -4 <br /> D 44W JAW-9-9 <br /> UPCF UST-D(12/2007)3/4 <br />