Laserfiche WebLink
AUCs -21-2005 11:23 FROM:UST.COMP.TESTING <br />Monitoring System Certification <br />LIM <br />Site Address: <br />209-531-1796 TO:4683433 P.5/5 <br />onitoring Site1 <br />...:.::.::.....::...............................:.. <br />............................ .. <br />..... .... .... ..... : ........ ....... <br />..... ....... <br />......... ....... <br />.. ................. <br />:::......................................... ....... <br />........... I ................. <br />..... ............ <br />..... .............. . ... Q - �0-. - - - .. - .. - -. -..- -1 <br />.... Ir . ...... I ....... a : ........... .... <br />......... .. <br />......... ... <br />Date mp was <br />if you already have a diagram that shows all required information, you may include it, rather than this page, with your <br />Monitoring system Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br />locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br />spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br />detectors; and in -tank liquid level probes (if used for leak detection). In the space provided, note the date this Site Plan <br />was prepared. <br />Page of 05100 <br />